USGBC announced on May 28, 2026 that the commercial LEED v4 and v4.1 registration close date would move from June 30, 2026 to June 30, 2027. The announcement covers BD+C, ID+C and O+M. It gives teams more time to register under those versions; it does not establish unlimited availability. [S1]
Registration and certification are different dates
The USGBC deadline matrix lists the applicable commercial rating systems with a June 30, 2027 registration close and a June 30, 2033 certification sunset. Registration close is the deadline for registering a project. Certification sunset is the deadline to submit the design or standard preliminary review application. The matrix separately describes the additional construction-review period for split reviews. [S2]
An existing project's registration is therefore not a requirement to finish certification by June 2027. Check its rating system, pathway and review stage against the current matrix. [S2]
Check the pathway row
Campus/Master Site, Group and Volume appear in a separate table. A new Volume project that references an existing prototype has its own registration row, with a June 30, 2030 registration close instead of June 30, 2027, so a single commercial headline cannot replace that lookup. Recertification also has explicit rows. Residential, Neighborhood Development, and Cities and Communities are outside the commercial matrix's stated scope. [S2]
What to record now
For a team intending to use v4 or v4.1, record the chosen rating system, project pathway, registration status and applicable review deadlines. The extension does not rewrite the credit requirements for that choice. Keep the correct edition and applicable addenda with the project record. [S1, S2]
Version-specific BD+C references are available for v4, v4.1, and v5.
Sources
[S1] USGBC registration extension announcement, May 28, 2026. The same announcement was verified on the official GBCI site because the USGBC article body was unavailable through the text reader.
[S2] USGBC certification deadlines, commercial rating-system table, pathway table and notes, checked November 21, 2026. Recheck the live matrix when making a registration decision.
Related credit reference: v4 Optimize Energy Performance and its registration-date scope.