If you add up every credit in LEED v4.1 BD+C Core and Shell one by one, you get 109 points. The scorecard says 110.

The missing point is in one credit: MRc1, Building Life-Cycle Impact Reduction.

What changed

On April 21, 2023, USGBC published a rating system correction for LEED v4.1, addendum 100002600. It applies to the MRc1 requirements and makes five edits:

  • The Core and Shell point range is revised to 1 to 5 points.
  • The requirements now read "Achieve one or more of the following options below for a maximum of 5 points."
  • The "2-6 points Core and Shell" wording is removed from the Option 1 and Path 1 titles.
  • The Core and Shell Points column is removed from Table 1.
  • The language between Option 1 and Option 2 becomes "AND/OR".

Before the correction, Core and Shell projects had their own column in Table 1 and could reach 6 points in MRc1. After it, Core and Shell follows the same 5-point maximum as New Construction.

Where 110 still shows up

The credit text was corrected. The summary was not.

  • The published LEED v4.1 BD+C scorecard still lists MRc1 at 6 points for Core and Shell, which is how it reaches 110.
  • The scorecard printed in the LEED v4.1 BD+C Reference Guide (November 2025) already shows MRc1 at 5, but it still totals Materials and Resources at 14 for Core and Shell and lists 110 possible points.

The arithmetic

Category maximums for v4.1 BD+C Core and Shell with MRc1 at 5 points:

  • Integrative Process: 1
  • Location and Transportation: 20 (LTc1 Neighborhood Development Location is an alternative to LTc2 through LTc8, which together also total 20)
  • Sustainable Sites: 11
  • Water Efficiency: 11
  • Energy and Atmosphere: 33
  • Materials and Resources: 13
  • Indoor Environmental Quality: 10
  • Innovation: 6
  • Regional Priority: 4

Total: 109. With MRc1 at 6, Materials and Resources becomes 14 and the total becomes 110.

Do the certification thresholds change?

No. A project that was counting on a sixth MRc1 point can still land one level lower, but the levels themselves do not move. LEED v4.1 certification levels are set in absolute points: Certified 40 to 49, Silver 50 to 59, Gold 60 to 79, Platinum 80 and above. A Core and Shell project needs the same 60 points for Gold whether the denominator is 109 or 110.

What does change:

  • Every "x out of 110" figure and every percentage built on it.
  • Any tracker, template or tool that still lets a Core and Shell project claim 6 points in MRc1. A project counting on the sixth point there is counting a point that does not exist.

What to check

  • If your project tracking spreadsheet was built from the v4.1 scorecard, check the MRc1 row for Core and Shell. It should allow 5 points, and Materials and Resources should total 13.
  • If a client deliverable reports a percentage of available points, decide whether you divide by 109 or 110 and say which.
  • If you are close to a certification threshold and counting on MRc1, plan for 5.

How VERTIQ handles it

VERTIQ follows the addendum. For LEED v4.1 BD+C Core and Shell projects, MRc1 is scored to a maximum of 5 points and the total available is 109. When you select v4.1 Core and Shell, the app shows a short note explaining the difference from the published scorecard, so the 109 does not look like a bug.

Sources

  • USGBC LEED addenda, 100002600 (Rating System Correction, LEED v4.1, April 21, 2023): usgbc.org/leedaddenda/100002600
  • LEED v4.1 BD+C Rating System, February 2025, MR Credit Building Life-Cycle Impact Reduction, page 93. Addendum 100002600 identifies the earlier location as page 174.
  • LEED v4.1 BD+C Reference Guide, November 2025, scorecard (page 7) and certification levels (page 8)
  • LEED v4.1 BD+C scorecard workbook (Core and Shell sheet), as downloaded from USGBC on October 28, 2026