Credit Optimize Energy Performance

Use the registration-specific energy edition; the 2024 Update sums an energy metric and GHG metric.12

Points
Up to 25
Applies to
ID+CBD+C
Other versions
v4.1
VERTIQ reference ID
EAc2

Reviewed · Spot an error? Report it

Points

Up to 25 points. In the 2024 Update that is Table 1 maximum 13 plus Table 2 maximum 12; the duplicated last GHG row does not conflict with this total.2

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Registration/date and envelope-route decision, early target and efficiency analysis.
  • Preparation checklist: Baseline/proposed tenant model outputs and separate Table 1/Table 2 calculations; renewable contracts and allocations if claimed.
  • Preparation checklist: For the original prescriptive route, lighting power density calculations, ENERGY STAR appliance percentage and, as applicable, envelope, HVAC efficiency and control-device records; Retail adds process equipment efficiencies.

Worked example

Assume a 2024 Update Sections a-e project has verified 25% source-energy and 25% GHG improvement. Each table yields 8 points, so 8 + 8 = 16. A Section f project at the same improvements would use different thresholds. Full prerequisite, model and renewable accounting still apply.2

Requirements

For the 2024 Update, establish a source-energy target by schematic design, analyze load/HVAC efficiency and use the Minimum Energy Performance tenant simulation criteria. Add Table 1 points for cost or source energy to Table 2 points for GHG improvement. Use the baseline-envelope Sections a-e or Section f column consistently. The official 2024 paths resource also lists v4.1 Option 2 Prescriptive Compliance for these registrations, up to 17 points using ASHRAE 90.1-2016 and/or Advanced Energy Design Guides. Approved equivalents for tenant simulation include ASHRAE 90.1-2013 or IECC 2015 (LI 10481), Title 24-2016 (LI 10480) and NECB 2011.23

For Sections a-e, both tables award 1-8 points at 8/10/12/14/16/19/22/25% improvement. Table 1 then awards 9/10/11/12/13 at 28/31/34/37/40%; Table 2 awards 9/10/11/12 at 30/35/40/50%. Section f thresholds are two percentage points higher. The current Table 2 repeats the final 12-point 50%/52% row; it does not state a thirteenth GHG point.2

For pre-March 1, 2024 registrations, the original simulation table ranges from 4 points at 4% improvement to 25 at 28%, with its stated intermediate thresholds. The original prescriptive route allows up to 16 points from base-building systems, HVAC controls, lighting and eligible equipment; Retail has additional process-equipment requirements. Do not combine original and 2024 point tables.12

FAQ

Does the repeated 12-point GHG row create a 13-point GHG tier?

No such tier is stated. Keep the published 12-point maximum.2

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Optimize Energy Performance; printed and PDF pp. 29-32
  2. USGBC LEED v4 ID+C Optimize Energy Performance (2024 Update)2024 Update; current online language checked October 28, 2026 · Option 1 Tenant-Level Energy Simulation; Tables 1 and 2 and notes
  3. ID+C LEED v4 2024 Energy Update and v4.1 pathsMarch 1, 2024 · PDF pp. 1-2, prescriptive and tenant simulation path comparison

Maintained by VERTIQ, LEED software for consultants.