Two energy modelers get the same office building in climate zone 5A, the same baseline run, and the same proposed run. Both calculate a Performance Cost Index of 0.60. One reports 16.7 percent below target and 3 cost points. The other reports 8.7 percent and 1 point. Neither made an arithmetic error. They pulled the Building Performance Factor from two different versions of "Table 4.2.1.1", and the evidence points to only one of them as the table LEED v4.1 means.
This is a reference for how LEED v4.1 BD+C scores energy performance under the Appendix G path, and which BPF values belong in the target.
What the credit is worth
- New Construction: 1 to 18 points.
- Core and Shell: 1 to 18 points.
- Schools: 1 to 16 points. Healthcare: 1 to 20 points.
- Retail, Data Centers, Warehouses and Distribution Centers, Hospitality: 1 to 18 points.
Under Option 1, Energy Performance Compliance, the total is the sum of two tables. Table 1 scores the percent below target on energy cost (1 to 9 points for NC and CS). Table 2 scores the percent below target on greenhouse gas emissions (1 to 9 points for NC). Option 1 sums the points from both tables. A cost-only model leaves half of that option on the table.
The prerequisite, EAp2 Minimum Energy Performance, is the gate. It requires compliance with ANSI/ASHRAE/IESNA Standard 90.1-2016, with errata, or a USGBC-approved equivalent. On the Appendix G path, the PCI must be less than or equal to the PCI target. There is no extra percentage on top of that, and the guide says either the cost or the GHG metric may be used to show prerequisite compliance. Credit points start at 5 percent below target for New Construction and 2 percent for Core and Shell.
USGBC extended LEED v4 and v4.1 commercial registration close to June 30, 2027, so new v4.1 projects can still be registered. This is not a legacy question.
How the target is built
90.1-2016 Appendix G works against a baseline that is meant to stay put. PNNL's reference manual for the 2016 Performance Rating Method describes that baseline as roughly equal in stringency to 90.1-2004, with the intent that it does not change between editions. The code edition enters through one number, the BPF, in the target equation from Section 4.2.1.1:
PCIt = [BBUEC + (BPF x BBREC)] / BBP
BBUECis the baseline's unregulated energy cost.BBRECis the baseline's regulated energy cost.BBPis the total baseline building performance.BPFcomes from Table 4.2.1.1, by building area type and climate zone.
The project's index is PCI = PBP / BBP, proposed building performance over baseline building performance. Points come from 1 - PCI / PCIt.
The BPF represents the ratio of 90.1-2016 regulated energy cost to 90.1-2004 regulated energy cost for a given building type and climate. It scales only the regulated share of the baseline. Unregulated cost passes through untouched. Inside the target equation, the BPF is the term that carries the code edition you are being measured against. Change it, and the target moves for every project of that type in that zone.
For the GHG metric, the v4.1 guide replaces cost with CO2-equivalent emissions in the same equations. The same BPF sits inside the GHG target too.
Two table rules matter for real buildings. Building area types not listed use All others. Buildings with several area types use the area-weighted average BPF.
There are two versions of Table 4.2.1.1
The table as published in 90.1-2016
This is the table printed in the 2016 standard and reproduced as Table 1 in PNNL-26917, the 90.1-2016 Performance Rating Method Reference Manual that Pacific Northwest National Laboratory prepared for the U.S. Department of Energy (September 2017). A few cells:
- Office, 5A: 0.60
- Office, 4A: 0.58
- Restaurant, 4A: 0.58
- School, 5A: 0.50
The table as revised by addenda bt and ci
After publication, ASHRAE revised the BPFs through two addenda to 90.1-2016. Addendum bt revises Table 4.2.1.1. Addendum ci further revises it. Both list ANSI approval in July 2019. ASHRAE's consolidated addenda package for 90.1-2016 prints the original table struck through, followed by the replacement table underlined. 90.1-2019 then prints the revised values as its own Table 4.2.1.1, with two exceptions noted below. The same cells:
- Office, 5A: 0.51
- Office, 4A: 0.51
- Restaurant, 4A: 0.62
- School, 5A: 0.36
Most cells went down. Comparing the published table with the 90.1-2019 table, 130 of the 153 cells are lower, 19 are higher, and 4 are unchanged. The two documents that carry the revised values also do not agree on every cell. In climate zone 4C, the Office and Hotel/motel values in 90.1-2019 differ from the addenda package. If your project sits in 4C and you are comparing sources, compare cell by cell.
Which one v4.1 points to
The v4.1 requirement names 90.1-2016 with errata. Errata and addenda are different instruments. The 90.1-2016 errata sheets we checked on ASHRAE's site (dated April 9, 2025, I-P and SI editions) contain no correction to Table 4.2.1.1, so errata do not change the BPFs.
Where the v4.1 guide does accept an addendum, it names it. It allows 90.1-2016 Addendum bf for the vestibule exception, and 90.1-2022 Addendum a for one district energy path. It names no addendum for Table 4.2.1.1.
USGBC's own v4.1 Minimum Energy Performance Calculator agrees, at least in the copy we checked (version 4, dated July 24, 2023). Its BPF sheet for 90.1-2016 holds the as-published values, and its dropdown labels that choice as the 90.1-2016 table for LEED v4.1.
So for the standard ASHRAE 90.1-2016 Appendix G route in LEED v4.1 BD+C, use the BPFs as published in 90.1-2016. The revised values from addenda bt and ci, and the 90.1-2019 table, are a different target. Nothing in the v4.1 guide we checked says "do not use addendum bt", so treat this as the best-supported reading of the requirement and confirm it with your reviewer if a project depends on it.
A worked example
Every input below is an assumption chosen to show the mechanics. Office building, New Construction, climate zone 5A, cost metric only.
- Baseline building performance
BBP: $200,000 (assumed) - Baseline regulated energy cost
BBREC: $140,000 (assumed) - Baseline unregulated energy cost
BBUEC: $60,000 (assumed) - Proposed building performance
PBP: $120,000 (assumed)
The project's index does not depend on the BPF: PCI = 120,000 / 200,000 = 0.60.
With the as-published BPF of 0.60:
PCIt = [60,000 + (0.60 x 140,000)] / 200,000 = 0.72
Percent below target: 1 - 0.60 / 0.72 = 16.7%. Table 1 for New Construction gives 3 points at 15 percent.
With the revised BPF of 0.51:
PCIt = [60,000 + (0.51 x 140,000)] / 200,000 = 0.657
Percent below target: 1 - 0.60 / 0.657 = 8.7%. That clears 5 percent but not 10 percent, so Table 1 gives 1 point.
Same building, same models, two cost points apart. Under the Core and Shell column the same two results would earn 4 points and 2 points. The GHG result moves in the same direction, because the same BPF scales the regulated GHG baseline.
The gap gets worse near the prerequisite line. Keep everything above but raise PBP to $140,000, so PCI = 0.70. Against the published target of 0.72, the project passes EAp2. Against 0.657, it appears to fail. A modeler using the wrong table could redesign a building that already complies.
Where the wrong number comes from
- The 90.1-2019 copy on the desk. Its Table 4.2.1.1 has the same title, the same building area types, and the same climate zone columns. Nothing on the table itself tells you it is the wrong edition for v4.1.
- The addenda package. Both tables appear back to back. The first is struck through, and in a quick copy-paste the formatting is easy to lose.
- Secondary summaries. A BPF copied from a deck or spreadsheet that does not name the edition and printing is not a source. Trace it back to the table.
What trips people up
- Assuming the revised table is always the conservative choice. It is lower for Office 5A, but Restaurant 4A goes from 0.58 to 0.62. Use the revised value there and the target gets easier, which overstates points.
- Reading "with errata" as "with addenda". The errata sheets do not touch Table 4.2.1.1. The addenda that do are not adopted by name in v4.1.
- Borrowing the 90.1-2019 compliance equation. 90.1-2019 adds a limit on how much on-site renewable energy can count toward the PCI. For the v4.1 prerequisite, only on-site or on-campus renewables count, per 90.1-2016 Section G2.4.1. For the credit, the table notes govern, and the GHG table also accepts Tier 2 new off-site renewables.
- Skipping the area weighting. A mixed-use building needs an area-weighted BPF, and unlisted area types use All others. Where a general and a specific building area type are both listed, the specific one applies.
- Using the wrong column. BD+C projects other than Data Centers whose proposed unregulated energy exceeds 50 percent of the proposed building performance, for the metric in question (cost or GHG), may use the Healthcare, Major Renovation, CS column. Data Centers with at least 40 percent gross colocation area may too.
- Modeling cost only. The prerequisite accepts either metric. Option 1 of the credit sums both tables.
Source: LEED v4.1 BD+C Getting Started Guide, November 2025 edition (still the file behind USGBC's v4.1 BD+C guide link as of November 21, 2026), EA Prerequisite Minimum Energy Performance at printed pages 102 to 104, 107 to 108, and 125, and EA Credit Optimize Energy Performance at pages 142 to 144. The February 2025 edition is identical on those pages. BPF values are from ANSI/ASHRAE/IES Standard 90.1-2016 (SI edition), Table 4.2.1.1 on printed page 43, cross-checked against PNNL-26917, Table 1, page 1.3. Revised values are from ASHRAE's consolidated package of addenda to 90.1-2016 (2021) and from 90.1-2019 (SI edition), Table 4.2.1.1, printed page 47, with addenda bt and ci listed in its Informative Appendix I. Errata status is from ASHRAE's 90.1-2016 errata sheets dated April 9, 2025. USGBC can issue addenda and interpretations at any time, so confirm the current requirement and the BPF your reviewer expects before you submit anything on the strength of a blog post.
For how v4.1 compares with the v5 energy credits, see LEED v5 vs v4. The free VERTIQ feasibility check gives an early benchmark estimate across supported BD+C v4, v4.1, and v5, ID+C v4, v4.1, and v5, and O+M v5 profiles; EAc2 points still need a full Appendix G baseline and proposed model, actual rates and emission factors, and the BPF from the right table: https://vertiq.net/feasibility