EAp5 Fundamental Refrigerant Management

Avoid refrigerants or inventory and manage all in-scope refrigerant equipment, prohibit HCFCs in new equipment, and check for leaks.1

Points
Required
Applies to
BD+CID+CO+M
Other versions
v4v4.1

Reviewed · Spot an error? Report it

Points

Required for NC and Core and Shell; no points. GWP above 700 triggers alternatives evaluation, rather than a blanket prohibition of every such refrigerant.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Refrigerant-containing equipment inventory with type, charge, and GWP
  • New-equipment refrigerant specifications
  • High-GWP alternative assessment where required
  • Leak, vacuum, and pressure test records and repair closeout
  • Option 1 description of the heating and cooling systems and how project loads are met without refrigerants

Worked example

Assume 10 kg of refrigerant with GWP 700. Its inventory impact is 10 × 700 = 7,000 kgCO2e, or 7 tonnes CO2e. This is an inventory calculation; it does not estimate actual annual leakage or show that leak checks have occurred.1

Requirements

Option 1 uses no refrigerants. Otherwise inventory installed project equipment and existing owner-owned equipment, including refrigerant type, GWP, charge, and total GWP. Evaluate alternatives for refrigerants with GWP greater than 700. Before substantial completion, check new and existing equipment and repair all leaks; field-assembled joints require leak, vacuum, and pressure checks before charging.1

FAQ

Does the prerequisite ban every refrigerant above GWP 700?

It requires evaluation of available alternatives above that value. It separately prohibits HCFC refrigerants in new equipment.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.