EAp4 Fundamental Refrigerant Management
Implement a refrigerant policy and document equipment, leakage inspection, and recharge.1
- Points
- Required
Reviewed · Spot an error? Report it
Points
Required prerequisite with no credit points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Refrigerant policy and removal procedures
- Equipment inventory with refrigerant charges and GWP
- Leak inspection, recharge, and procurement logs
Worked example
Assume a system contains 100 kg of refrigerant with GWP 1,000 and 2 kg is recharged because of leakage. Inventory GWP is 100,000 kg CO2e and leaked GWP is 2,000 kg CO2e. Keep the policy, inspection, and dated tracking records; this multiplication alone does not complete the prerequisite.1
Requirements
Address proper equipment/refrigerant removal and applicable leakage-management rules. Inventory refrigerant equipment under owner or management control, including refrigerant type, charge, GWP, and total GWP. Inspect visually for leakage and recharge leaking equipment. Track recharge or procurement by refrigerant type and weight, and report leaked refrigerant GWP. Initial certification requires tracking for at least the last three months of the 12-month period and all recharge arising from the leakage inspection.1
FAQ
Is three months of tracking always enough?
The minimum last-three-month provision is stated for initial certification. The source otherwise describes performance and reporting over the 12-month period.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 O+M Rating SystemJuly 2026 · EAp4, printed pp. 35-36 (PDF pp. 41-42); scorecard pp. 1-2