Prerequisite Fundamental Refrigerant Management

Avoid CFC refrigerants in new HVAC&R and address CFCs in reused equipment.1

Points
Required
Applies to
BD+CID+C
Other versions
v4.1v5
VERTIQ reference ID
EAp4

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • HVAC&R equipment/refrigerant schedule
  • Existing equipment inventory
  • CFC conversion or accepted phase-out documentation

Worked example

Assume two existing nonexempt chillers contain CFCs and only one is converted. Conversion coverage is 1 / 2 = 50%, which does not establish compliance for the reused systems. The remaining unit needs a compliant resolution.1

Requirements

Do not use CFC-based refrigerants in new systems. For reused equipment, complete a comprehensive CFC phase-out conversion before completion, unless an extended plan is accepted on its merits. The source exempts specified small units and other equipment containing less than 0.5 lb (225 g) refrigerant.1

FAQ

Does using a refrigerant with nonzero GWP automatically fail this prerequisite?

This prerequisite addresses CFCs. The Enhanced Refrigerant Management credit has additional ODP/GWP criteria.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Fundamental Refrigerant Management prerequisite, printed/PDF pp. 69