EAc6 Enhanced Refrigerant Management

Use no refrigerants, reduce weighted refrigerant GWP and/or implement the specified leakage controls.1

Points
See below
Applies to
ID+CBD+C
Other versions
v4v4.1

Reviewed · Spot an error? Report it

Points

Maximum 2 points. No refrigerants earns 2; weighted-GWP ratios no higher than 80% or 50% earn 1 or 2; leakage management earns 1. GreenChill Silver earns 1 and Gold/Platinum earns 2 for eligible food retail.1

Exemplary performance: A total weighted average refrigerant GWP of 25 or less across all new refrigerant-containing equipment under Option 1 earns 1 exemplary performance point; projects qualify only when included equipment totals at least 2.5 Btu/h per ft² (8 W/m²) of conditioned floor area or at least 50% of the combined refrigerant equipment capacity serving the project, claimed under Project Priorities (EP8).2

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: New-equipment refrigerant inventory and weighted benchmark calculation
  • Preparation: Self-contained/field-joint and leak-detection specifications
  • Preparation: Maintenance plan or eligible GreenChill evidence

Worked example

Assume all new refrigerant equipment is in one HVAC category with a 700 benchmark and a documented weighted GWP of 300. Ratio = 300 / 700 x 100 = 42.86%, below 50%, earning 2 points under Option 1 if all applicable equipment and other conditions are included. No leakage-management point is added above the 2-point cap.1

Requirements

Option 1 earns 2 points for no refrigerant-containing equipment, or 1/2 points where the weighted GWP of all new equipment is no more than 80%/50% of the weighted category benchmark. Benchmark values are 1,400 for heat-pump service water heaters, 700 for the listed HVAC/data-center/process-chiller categories and 300 for other process refrigeration.1

Option 2 applies the self-contained-equipment, field-piping, automatic-detection and maintenance requirements. For initial build-out projects with less than 50% of refrigerant-equipment capacity installed within the project scope, document compliance for base-building systems as well as project-installed systems. All equipment using refrigerants above 700 GWP must be self-contained, and self-contained equipment must also represent at least 80% of the total refrigerant GWP used in the project. Fully enclosed equipment spaces above 100 tCO2e charge require automatic leak detection. Apply the specified inspection intervals and more frequent checks when annual recharge/leakage exceeds 1%.1

Retail may combine Options 1/2 and the qualifying GreenChill food-retailer option within a 2-point cap. GreenChill applies where food retail exceeds 20% of project gross area. U.S. projects demonstrate EPA GreenChill certification; international projects comply with the relevant GreenChill requirements for the certification level. District-energy projects must address credit requirements at the district facility or follow additional official guidance.1

FAQ

Can leakage management increase a 2-point low-GWP award to 3?

No. The total credit maximum is 2.1

Does the GreenChill route apply to every retail tenant?

No. Food retailing must exceed 20% of the project gross area.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · EAc6; printed pp. 65-67, PDF pp. 70-72; scorecard printed pp. 1-2, PDF pp. 6-7
  2. USGBC LEED credit library: Enhanced Refrigerant Management: Exemplary Performance (EP8)Published Apr 22, 2025; retrieved November 8, 2026 · EP8 requirements

Maintained by VERTIQ, LEED software for consultants.