Credit Enhanced Refrigerant Management
Choose low-impact refrigerants or calculate the combined refrigerant impact of equipment serving the tenant.1
- Points
- 1 point
- Applies to
- ID+CBD+C
- VERTIQ reference ID
- EAc5
Reviewed · Spot an error? Report it
Points
1 point for one complete applicable route.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation checklist: Equipment/refrigerant schedule, tags, charge, capacity, ODP/GWP and life assumptions.
- Preparation checklist: Lifecycle-impact calculation and Retail leak testing or GreenChill certification if applicable.
Worked example
Assume a CI Option 2 system has ODP=0, GWP=1,000, annual leakage 0.02, end-of-life loss 0.10, life 10 years and charge 2 lb/ton. LCGWP = 1,000 x (0.02 x 10 + 0.10) x 2 / 10 = 60 lb CO2/ton-year; LCODP=0. The IP result 60 is below 100. Include every applicable system before concluding compliance.1
Requirements
For CI/Hospitality, Option 1 uses no refrigerants or only refrigerants with zero ODP and GWP below 50. Option 2 limits capacity-weighted lifecycle climate plus ozone impact to 100 in IP units or 13 in SI units, including new/existing base-building and tenant HVAC&R serving the project.1
Retail meets Option 1 or 2 for HVAC. Commercial refrigeration also requires non-ozone-depleting refrigerants, limited HFC charge, annual emissions no more than 15%, and installation leak testing; qualifying EPA GreenChill Silver certification for newly constructed stores is an alternative for those systems.1
FAQ
Can the base-building systems serving the tenant be omitted?
Option 2 includes both base-building and tenant HVAC&R that serves the project.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Enhanced Refrigerant Management; printed and PDF pp. 35-37
- LEED v4 Reference Guide for Interior Design and Construction AddendaCumulative through February 20, 2026 · PDF p.25, Reference Guide p.206, February 20, 2026 equipment-tag documentation correction
Maintained by VERTIQ, LEED software for consultants.