EAc4 Enhanced Commissioning

Add independent enhanced commissioning and/or sustained monitoring-based commissioning to the prerequisite process.1

Points
See below
Applies to
ID+CBD+C
Other versions
v4v4.1

Reviewed · Spot an error? Report it

Points

Option 1 earns 2 points. Option 2 earns 1 for Basic or 2 for Enhanced MBCx. Combine Option 1 with one Option 2 path for a maximum of 4.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: CxP appointment, ASHRAE 202 plan and required reviews/meetings
  • Preparation: MBCx scope, three-year commitment, EIS specifications and staff training
  • Preparation: Enhanced MBCx/FDD coverage and reporting evidence when applicable
  • Preparation: Water penetration and infrared field test reports when the envelope-alteration trigger applies

Worked example

Assume the project independently satisfies Option 1 and Enhanced MBCx Path 2. The award is 2 + 2 = 4 points. The Enhanced MBCx requirements include Basic MBCx; they do not add a separate third MBCx point.1

Requirements

Option 1 appoints an independent CxP in pre-design or very early design and applies ASHRAE 202-2024 across in-scope systems and base-building interconnections. Include the additional meetings, ongoing plan and training review/confirmation. Qualifying envelope alterations also trigger the specified field tests.1

Option 2 Basic MBCx commits to at least three years with roles, staff training, trend-monitoring technology, fault/correction actions and at least annual reporting. Provide a remotely accessible energy information system and required energy comparisons, visualizations and applicable hourly monitoring.1

Enhanced MBCx adds a coordinated provider/corporate program, quarterly fault/anomaly communication and enhanced software/monitoring. The large-system FDD trigger applies above 7,200 kBtu/hr for an applicable installed system capacity, with at least 60% capacity coverage of both listed equipment groups and three-year trend history.1

FAQ

Can Basic and Enhanced MBCx be stacked as separate paths?

No. They are alternative paths under Option 2; Enhanced includes Basic requirements.1

Is a one-year monitoring commitment enough?

The MBCx option specifies a minimum of three years.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.