Credit Enhanced Commissioning

Extend the fundamental commissioning process through enhanced verification or a monitoring-based program. Choose the applicable option; its points are not added to the other option.1

Points
4 to 5 points
Applies to
ID+CBD+C
Other versions
v4v5
VERTIQ reference ID
EAc1

Reviewed · Spot an error? Report it

Points

PointsRequirement
4Option 1 Enhanced Commissioning
5Option 2 Enhanced and Monitoring-Based Commissioning

Maximum: 5, rather than 4 + 5.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Enhanced commissioning plan, ongoing commissioning plan, authority qualifications, submittal reviews, confirmation of systems manual delivery, and training outline with participation list.
  • Preparation checklist: Seasonal testing and 10-month review records, or the contract to implement them; for Option 2, monitoring and trending point list and schedule, acceptable limits, and the action plan and quarterly analysis frequency from the commissioning plan.

Worked example

Assume a tenant completes the enhanced submittal/manual/training reviews and seasonal tests, then implements the specified monitoring plan and quarterly first-year reviews. Document the full Option 2 scope to pursue 5 points. Completing only the Option 1 scope supports 4 points.1

Requirements

Implement, or have in place a contract to implement, these activities in addition to the prerequisite. Option 1 reviews contractor submittals; includes systems manual and operator and occupant training requirements in the construction documents; verifies systems manual updates and delivery, training delivery and effectiveness, and seasonal testing; reviews building operations 10 months after substantial completion; and develops an ongoing commissioning plan. Follow the detailed commissioning-authority requirements.1

Option 2 includes Option 1 and a monitoring-based commissioning plan. Define roles, meters/points, acceptable performance ranges, fault detection, corrective actions, training and repairs. Evaluate performance at least quarterly during the first year of occupancy. Update the systems manual with any modifications or new settings and give the reason for any modification from the original design.1

FAQ

Is ordinary utility monitoring sufficient for Option 2?

No. The monitoring-based commissioning plan must cover the specified performance evaluation, fault detection, corrective action and operating processes.1

Can the two option scores be added?

No. The monitoring option includes the enhanced scope and has a total value of 5 points.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 Interior Design and Construction GuideNovember 2025 · Enhanced Commissioning, printed/PDF pp. 73-74; ID+C scorecard printed/PDF pp. 5-6

Maintained by VERTIQ, LEED software for consultants.