LTc5 Electric Vehicles
Provide qualifying installed EV charging, EV-ready parking, or both, while keeping the two sets of spaces separate.1
Reviewed · Spot an error? Report it
Points
NC and Core and Shell: maximum 2 points. Installed EVSE earns 1-2; the readiness option earns 1 within the cap. Commercial readiness requires at least 10% or 10 spaces; residential requires at least 20% or 20, whichever is greater.1
Exemplary performance: doubling the highest EVSE parking threshold under Option 1 earns 1 exemplary performance point, claimed under Project Priorities (EP5).3
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Parking plan with installed EVSE and separate EV-ready spaces marked
- EVSE specifications and connected-functionality documentation
- Accessible charging-space layout
- Electrical single-line diagram, circuit/panel schedule, and wired-readiness details
Worked example
Assume 100 commercial parking spaces. Two-point installed EVSE requires max(10% × 100, 4) = 10 charging spaces. A separate readiness claim would need max(10% × 100, 10) = 10 additional ready spaces; installed spaces cannot be reused for that count. The overall cap remains 2 points.1
Requirements
Installed EVSE must meet the specified voltage, Level 2/3, connected-functionality, and accessibility criteria. Commercial thresholds are 5% or at least 2 spaces for 1 point, and 10% or at least 4 for 2; use whichever is greater. Residential thresholds differ. EV-ready spaces require the full specified circuit, panel capacity, wired raceway, and termination; spaces counted as installed EVSE cannot also count as EV-ready.1
Count all parking used by the project, including spaces outside the project boundary. Where parking is shared, count only the project's allocation. Exclude on-street public parking and fleet or inventory spaces that are not regularly used for commuting. EVSE spaces must be dedicated to the project and cannot be counted toward another LEED project.2
FAQ
Does an empty conduit count as EV-ready?
The requirement includes a full circuit, specified panel capacity, wiring, and a junction-box or charging-outlet termination, not conduit alone.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 BD+C Rating SystemJuly 2026 · LTc5, printed pp. 33-34
- LEED v5 BD+C AddendaJuly 31, 2026 · LTc5: Electric Vehicles, Further Explanation, Addenda PDF p. 4 (Reference Guide p. 98)
- USGBC LEED credit library: Electric Vehicles: Exemplary Performance (EP5)Published Apr 21, 2025; retrieved November 8, 2026 · EP5 requirements
Maintained by VERTIQ, LEED software for consultants.