Credit Electric Vehicles

Install EV charging or EV-ready infrastructure, or use the adaptation's permitted fleet route.1

Points
1 point
Applies to
BD+C
Other versions
v5
VERTIQ reference ID
LTc8

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Parking plan and EV-space schedule
  • EVSE product data and controls specifications
  • Electrical single-line/circuit drawings
  • Schools Option 3: bus and non-bus vehicle plans; Warehouses: yard tractor manufacturer data, or site plan and count of connected dock doors and truck parking locations, with idling-policy signage
  • Photographs of signage or pavement marking at reserved EV spaces (Option 1)

Worked example

Assume a general-route project has 80 parking spaces. Charging requires max(80 x 5%, 2) = 4 spaces. The alternative EV-ready route requires max(80 x 10%, 6) = 8. Meeting one numeric count does not waive equipment and circuit requirements.1

Requirements

For the general charging route, provide Level 2 or higher EVSE for 5% of project parking spaces or at least two, whichever is greater, with connector, functionality and reserved-use requirements. The EV-ready route needs 10% or at least six spaces, with dedicated circuit, conduit, wire and enclosure. Schools may use their defined fleet plan. Warehouses and Distribution Centers use their own electric yard-tractor or reduced truck-idling options instead of the general routes.1

FAQ

Does conduit alone make a space EV Ready?

No. The route specifies a dedicated electrical circuit with sufficient Level 2 capacity, conduit, wire and a nearby box/enclosure.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.