LTc3 Electric Vehicles

Provide the required number of compliant EV charging spaces, including accessible charging.1

Points
See below
Applies to
O+MBD+CID+C

Reviewed · Spot an error? Report it

Points

1 point for the applicable parking threshold and all technical/accessibility conditions.1

Exemplary performance: installing EVSE for at least 10% of parking spaces in a commercial facility or at least 20% in a residential facility earns 1 exemplary performance point, claimed under Project Priorities (EP5).3

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Allocated parking inventory and EVSE percentage calculation
  • EVSE technical specifications and connected-function evidence
  • Accessible charging layout and dimensions

Worked example

Assume a commercial project has 100 in-scope parking spaces. The requirement is max(5% x 100, 2) = 5 charging spaces. At least one must satisfy the accessible-station criteria; five noncompliant chargers do not earn the credit.1

Requirements

Install qualifying Level 2 or 3 EVSE with the required voltage, connector standard, connected functionality, and accessibility. Commercial projects need 5% of total parking or at least two spaces, whichever is greater; residential projects need 10% or at least five. At least one station needs an accessible space at least 8 feet wide and a 5-foot access aisle, plus the listed accessibility features. Apply the addenda's dedicated/allotted parking scope; do not include on-street public parking or double-count shared-project allocations. EVSE provided for carshare does not count toward LTc3.21

FAQ

Can one shared space be counted by two projects?

The July addenda require project-dedicated/allotted capacity and prevent counting the same EVSE parking space toward another project. Document shared-parking allocation.21

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 O+M Rating SystemJuly 2026 · LTc3, printed pp. 21-21 (PDF pp. 27-27); scorecard pp. 1-2
  2. LEED v5 O+M cumulative addendaJuly 31, 2026 · PDF pp. 2-3, LTc3: February width correction and July 31, 2026 parking-capacity allocation guidance
  3. USGBC LEED credit library: Electric Vehicles: Exemplary Performance (EP5)Published Apr 22, 2025; retrieved November 8, 2026 · EP5 requirements