Credit Enhanced Refrigerant Management

Minimize refrigerant ozone-depletion and climate impacts beyond the CFC prerequisite.1

Points
1 point
Applies to
BD+CID+C
Other versions
v4.1v5
VERTIQ reference ID
EAc6

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Refrigerant equipment schedule with equipment tag per drawings, equipment type and quantity, refrigerant type, charge, cooling capacity and equipment life
  • Manufacturer ODP/GWP documentation
  • Life-cycle refrigerant calculation if using Option 2
  • Retail commercial refrigeration specifications with leak test results or GreenChill certification, if applicable

Worked example

Assume every nonexempt system uses a verified refrigerant with ODP = 0 and GWP = 3. Since 3 < 50, it meets the refrigerant-property screen for Option 1; equipment coverage and the remaining conditions must still be checked.1

Requirements

Choose no refrigerants/only refrigerants with zero ODP and GWP below 50, or complete the specified life-cycle refrigerant impact calculation across the relevant new/existing base-building and tenant systems. Apply capacity weighting across multiple equipment types. Retail commercial refrigeration has a separate compliance path.1

FAQ

Is passing the CFC prerequisite enough?

No. This credit adds its own low-impact or calculated-impact requirements.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Enhanced Refrigerant Management, printed/PDF pp. 81-83

Maintained by VERTIQ, LEED software for consultants.