Credit Optimize Energy Performance

LEED v4.1 BD+C Optimize Energy Performance Option 1 adds separately earned cost and greenhouse-gas points, using improvement of each PCI below its corresponding PCIt; standard New Construction can earn up to 18 points.1

Points
See below
Applies to
BD+CID+C
Other versions
v4
VERTIQ reference ID
EAc2

Reviewed · Spot an error? Report it

Points

Option 1 awards up to 18 points for standard New Construction and Core and Shell, 16 for Schools and 20 for Healthcare.1

In the New Construction column, 10% cost improvement earns 2 points and 10% GHG improvement earns 2 points; the thresholds diverge at higher tiers, so the two metrics cannot share one lookup.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Energy model report and baseline/proposed cost and GHG results for the selected ASHRAE compliance path.
  • Calculation report showing PCI, PCIt, building types, applicable BPF source and area weighting for mixed use.
  • Design analysis narrative and building drawings or equipment schedules supporting efficiency measures.

Worked example

Illustrative standard New Construction: cost PCI = 0.54 and cost PCIt = 0.60, giving (0.60 - 0.54) / 0.60 × 100 = 10% improvement and 2 Table 1 points. If the independently calculated GHG PCI = 0.45 and GHG PCIt = 0.50, its 10% improvement earns 2 Table 2 points, for 4 points total. These PCI targets are assumed inputs for arithmetic, not BPF values for a real building.1

Requirements

This page covers Option 1. The credit also offers other compliance options with their own requirements.1

Analyze efficiency opportunities during design and use the findings in design decisions, including load reduction and HVAC strategies.1

For Option 1, use ASHRAE 90.1-2016 Appendix G and Table 4.2.1.1 to determine PCI and PCIt; mixed-use buildings use an area-weighted average of building types.1

Calculate cost and GHG performance separately, then add the points earned from Table 1 and Table 2. Check the project-type columns and table notes before assigning points.1

FAQ

Can the energy cost percentage be used for GHG points?

No. Option 1 requires PCI, PCIt and improvement for cost and GHG separately, using Tables 1 and 2.1

Is 18 points the maximum for every project?

No. Option 1 has a 16-point maximum for Schools and a 20-point maximum for Healthcare; the applicable adaptation and pathway matter.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 BD+C Rating SystemFebruary 2025 · Optimize Energy Performance, printed/PDF pp. 75-77, Option 1 and Tables 1-2

Maintained by VERTIQ, LEED software for consultants.