PRc1 Project Priorities

Use applicable library credits, exemplary performance, pilots, innovation, and professional participation within the 10-point cap.1

Points
Up to 10
Applies to
O+MBD+CID+C

Reviewed · Spot an error? Report it

Points

Up to 10 points in any eligible combination. The cap does not approve a proposed strategy or assign every strategy the same value.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Applicable library-credit criteria and achievement evidence
  • Innovation baseline, whole-project components, and measurement plan
  • LEED AP O+M credential and principal-participant role record

Worked example

Assume applicable reviewed library achievements provide 8 points and another proposed set is worth 3 if accepted. The credit can contribute no more than min(8 + 3, 10) = 10 points. Actual eligibility and award values must be established before using this sum.21

Requirements

Select applicable regional or project-type priorities, exemplary-performance or pilot credits from the USGBC Credit Library. Innovative strategies need a defined intent, compliance requirements, submittals, and approach. The July addenda require quantitative improvement against a baseline, whole-project coverage with at least two components, and performance significantly beyond standard practice. The LEED professional path names an on-site principal property-team participant with LEED AP O+M credentials.21

FAQ

Does using one innovative product establish an innovation credit?

The July criteria require comprehensive whole-project performance with at least two components, a quantitative baseline comparison, and performance beyond standard practice. A single product does not establish that proposal.21

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 O+M Rating SystemJuly 2026 · PRc1, printed pp. 82-83 (PDF pp. 88-89); scorecard pp. 1-2
  2. LEED v5 O+M cumulative addendaJuly 31, 2026 · PDF pp. 6-7, PRc1: July 31, 2026 Credit Library naming and innovation criteria

Maintained by VERTIQ, LEED software for consultants.