PRc1 Project Priorities
Combine eligible regional, project-type, exemplary-performance, pilot or approved innovation achievements for up to 9 points.1
- Points
- Up to 9
Reviewed · Spot an error? Report it
Points
Maximum 9 points across eligible achievements. The Rating System does not automatically award one point to every submitted idea; use the applicable credit requirements and approved award.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Current applicable Credit Library requirements and achievement evidence
- Preparation: Innovation baseline, measurable results and multi-component scope if proposed
- Preparation: Project-type or regional narrative and submittals, or pilot credit registration, survey and submittals, as applicable
Worked example
Assume three eligible priority achievements have documented awards of 2, 3 and 1 points. Their total is 6, below the 9-point cap. These assumed awards must each be supported by their own applicable credit or approval; submitting three proposals alone does not earn 6 points.1
Requirements
Use applicable credits from USGBC's Credit Library for regional priority, project type, exemplary performance or pilot achievements. Innovation must achieve significant measurable performance through a strategy not already addressed in the rating system and identify intent, compliance requirements, submittals and the design approach.1
The July addendum's innovation criteria require quantitative improvement against a baseline, a comprehensive whole-project strategy with at least two components, and performance significantly beyond standard sustainable practice. A single product is not a complete innovation strategy.2
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · PRc1; printed pp. 107-108, PDF pp. 112-113; scorecard printed pp. 1-2, PDF pp. 6-7
- LEED v5 ID+C Addenda Table, cumulativeJuly 31, 2026; individual post dates identified in locator · PDF p. 10, PRc1 Credit Library terminology and innovation-strategy criteria; July 31, 2026
Maintained by VERTIQ, LEED software for consultants.