PRc1 Project Priorities

Earn qualifying regional, project-type, exemplary-performance, pilot, or innovation achievements within the project-priorities cap.1

Points
Up to 9
Applies to
BD+CID+CO+M

Reviewed · Spot an error? Report it

Points

NC and Core and Shell: maximum 9 points from an eligible combination. The section does not assign nine points automatically for nine unreviewed ideas.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Selected Credit Library requirements and applicability record
  • Regional/project-type/exemplary/pilot achievement evidence
  • Innovation proposal stating intent, measurable baseline/improvement, requirements, submittals, and design approach
  • Project-priority points register

Worked example

Assume five independently eligible achievements have confirmed values of 1 point each. Subtotal = 5 × 1 = 5 points, below the 9-point cap. The one-point value is an explicit example assumption; confirm the actual library/innovation award for each selected achievement.1

Requirements

Use USGBC's Credit Library for the eligible regional, project-type, exemplary, and pilot credits. Innovation must demonstrate significant measurable performance through a strategy not addressed by the rating system, with a stated intent, proposed compliance requirements, submittals, and design approach. Eligibility is specific to the chosen strategy and project; a generic sustainability claim is insufficient.1

For proposed innovation, the July 31, 2026 addenda further explain three eligibility criteria: compare the final design with an identified or established quantitative standard-performance baseline; apply a comprehensive strategy to the entire LEED project with at least two components, rather than a single product or a limited portion; and perform significantly better than standard sustainable design practices.2

FAQ

Can an ordinary prerequisite be claimed again as innovation?

The innovation route requires significant measurable performance from a strategy not addressed by the rating system; evaluate the actual library or proposed innovation requirements.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 BD+C Rating SystemJuly 2026 · PRc1, printed pp. 171-172
  2. LEED v5 BD+C AddendaJuly 31, 2026 · PDF p.9, PRc1 Requirements Explained, Reference Guide p.513