EQc6 Resilient Spaces

Implement a building operating mode for an episodic outdoor-air event or respiratory-disease risk.1

Points
See below
Applies to
O+MBD+CID+C

Reviewed · Spot an error? Report it

Points

1 point through either implemented management-mode path.1

Exemplary performance: achieving both Option 1 and Option 2 earns 1 exemplary performance point, claimed under Project Priorities (EP20).2

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Management-mode assessment and implementation record
  • Applicable Guideline 44 or ASHRAE 241 operating/readiness plan
  • Updated CFR/O+M plan
  • Management-mode design and sequence of operations, plus equivalent clean airflow calculator for the respiratory-disease option

Worked example

Assume a building has implemented the applicable Guideline 44 outdoor-event mode and incorporated its operating procedures in the CFR/O+M plan. This follows the 1-point path if all referenced requirements are met; a policy naming wildfire smoke without the capability does not.1

Requirements

Choose one complete path. Assess, plan, and implement the capability to operate an episodic outdoor-event mode under ASHRAE Guideline 44, such as for wildfire smoke, and include it in the CFR/O+M plan. Alternatively, implement infection-risk management using ASHRAE 241-2023 Section 9 and incorporate the building readiness plan in the CFR/O+M plan.1

FAQ

Does adding a risk statement to the O+M plan complete the credit?

The source requires assessment, planning, and implementation of the operating capability, with the relevant mode or readiness plan incorporated in the CFR/O+M plan.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 O+M Rating SystemJuly 2026 · EQc6, printed pp. 76-76 (PDF pp. 82-82); scorecard pp. 1-2
  2. USGBC LEED credit library: Resilient Spaces: Exemplary Performance (EP20)Published Apr 22, 2025; retrieved November 8, 2026 · EP20 requirements