EAc3 Renewable Energy
Supply or procure qualifying renewable energy against the tenant's annual site-energy denominator, with a 5-point cap.1
Reviewed · Spot an error? Report it
Points
Maximum 5 points. Tier 1 annual-energy shares of 5%, 10%, 20% and 35% earn 1-4, and Tier 1 can instead earn 1 or 2 points through minimum rated capacity of A x 1 or A x 2 W/sq. ft. (A x 10.8 or A x 21.6 W/sq. m.), where A is the gross floor area of up to the three largest building floors, prorated to the project; Tier 2 shares of 20%, 40%, 60% and 80% earn 1-4; Tier 3 gives 1 at 50% or 2 at 100%. 100% Tier 1 and/or Tier 2 earns 5. Tier points may combine within the cap. Platinum requires 100% tenant annual site energy from eligible Tiers 1-3.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Annual tenant energy denominator and any base-building allocation
- Preparation: Procurement contract, asset operation dates and tier evidence
- Preparation: Environmental-attribute retirement, vintage and location records
- Preparation: Tier 1 system plans, rated capacity (DC and AC), total tenant area and rated-capacity calculation if using Tier 1
Worked example
Assume the applicable annual tenant site-energy denominator is 100 MWh, with 40 MWh/year of eligible Tier 2 supply under a full ten-year contract and retired attributes. Coverage = 40%, corresponding to 2 points. No Tier 1 or Tier 3 contribution is assumed.1
Requirements
Include annual electricity and fuel for systems/equipment within the boundary or exclusively serving the project, plus thermal energy supplied directly from a utility/provider or off-building plant. Shared AHUs and shared thermal energy are excluded from the first category. Base-building renewables may be allocated equally across total building area, or incremental to the specified Core and Shell renewable requirement.1
Tier 1 is qualifying on-site/campus generation or a compliant social-impact project. Tier 2 is new off-site electricity meeting the stated commercial-operation/contract timing. Tier 3 is qualifying certified or equivalent off-site electricity or renewable fuels. Document ten-year procurement or prorate shorter terms across ten years.1
Retire environmental attributes on behalf of the project; match renewable electricity and fuels to eligible energy uses without exceeding the applicable annual amount. Follow the 18-month certificate vintage rule, same-country/region conditions for off-site assets, and extra certification condition for Tier 2 bulk purchases.1
FAQ
Can a three-year contract be treated as ten years at full value?
No. Shorter contracts are prorated across ten years.1
Does buying certificates permit counting the same renewable electricity against fuel use?
The text limits renewable electricity and renewable fuels to their specified eligible electricity, fuel and district-energy uses.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · EAc3; printed pp. 54-56, PDF pp. 59-61; scorecard printed pp. 1-2, PDF pp. 6-7
Maintained by VERTIQ, LEED software for consultants.