Credit Renewable Energy

Procure renewable energy against the project total annual site-energy demand using the eligible on-site, new off-site or existing off-site tier. Retain and retire the associated environmental attributes for the project.1

Points
See below
Applies to
ID+CBD+C
Other versions
v5
VERTIQ reference ID
EAc4

Reviewed · Spot an error? Report it

Points

The scorecard, applicability header and Table 1 show a 6-point maximum, while the introductory requirements sentence says category points may be added to a total of 5. The 5-point sentence reads as a typo: the scorecard totals reach 110 only with 6 here, so the credit is worth up to 6 points. The worked example uses a single 3-point tier.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Annual site-energy denominator and generation/procurement quantities with common units.
  • Preparation checklist: Contracts, asset eligibility/timing, geography, certification/equivalence and attribute-retirement evidence.

Worked example

Assume annual site-energy demand is 1,000,000 kWh equivalent and qualifying Tier 1 generation is 100,000 kWh equivalent, with attributes retained. Share = 100,000 / 1,000,000 x 100 = 10%. Table 1 assigns 3 Tier 1 points. This example does not depend on the unresolved 5-versus-6 overall cap.1

Requirements

Tier 1 is on-site renewable generation with attributes retained. Tier 2 is off-site renewable electricity from a generation asset built within the last five years or contracted to be operational within two years of building occupancy. Assess the asset age at the beginning of the contract. Tier 3 includes qualifying existing off-site renewables or captured bio-methane. Apply the specified Green-e certification/equivalence and geographic conditions.1

Use total annual site energy as the percentage denominator. Renewable electricity/EACs may be applied only to electricity or district energy; captured bio-methane only to fuel use. Contracts normally cover at least 10 years, with shorter contracts prorated under the credit. Environmental attributes must be retired for the project rather than sold or claimed twice.1

Table 1 awards 1-6 points at Tier 1 shares of 2/5/10/15/20/25%, and Tier 2 shares of 10/20/30/40/50/60%. Tier 3 shares of 25/50/75/100% earn 1-4 points. The Guide contains an unresolved overall-cap inconsistency described below.1

FAQ

Can purchased renewable electricity offset every fuel in the denominator?

No. The allowed energy-type allocation differs by procurement type. Renewable electricity/EACs apply to electricity or district energy, while captured bio-methane applies to fuel.1

Can the sixth point be treated as settled from this Guide alone?

Yes. Table 1, the heading and the scorecard show six points, and the scorecard totals reach 110 only with six; the introductory five-point sentence reads as a typo.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.