Credit Indoor Water Use Reduction

Count all fixtures needed by tenant occupants, including necessary fixtures outside the tenant space.1

Points
See below
Applies to
ID+CBD+C
Other versions
v4.1
VERTIQ reference ID
WEc1

Reviewed · Spot an error? Report it

Points

2-12 points. Apply the adaptation-specific fixture table and eligible process tables, rather than assigning the CI fixture maximum to every adaptation.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Complete occupant-serving fixture inventory, calculations and nonpotable-water supply evidence.
  • Preparation checklist: For process points, table-eligibility evidence and a complete equipment compliance schedule.

Worked example

Assume a CI project has all required fixtures in its calculation, with baseline 100,000 and proposed 60,000 gallons/year. Reduction is 40%, which corresponds to 8 points. This is a CI fixture example, not a Retail appliance-point example.1

Requirements

Reduce aggregate fixture/fitting consumption beyond the prerequisite baseline. Alternative water may contribute. Include the fixtures necessary to meet occupant needs, even if they are outside the tenant project. At minimum that means necessary restroom fixtures, plus showers when seeking Bicycle Facilities; Retail includes the nearest public or common-area restrooms if the project provides none for customers. The WaterSense label requirement does not apply to fixtures outside the project scope.12

Commercial Interiors earns 2/4/6/8/10/12 points at 25/30/35/40/45/50% reduction. Retail fixture points stop at 10 for 45%; Hospitality earns 11 at 50%. Retail/Hospitality can add 1 point for a fully compliant applicable appliance/process table, and Retail can add a second for a second table, subject to table eligibility and the 12-point maximum.1

FAQ

Can the project omit base-building restrooms it uses?

No. Include fixtures necessary for occupant needs even when outside the tenant space.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Indoor Water Use Reduction; printed and PDF pp. 19-21
  2. LEED v4 Reference Guide for Interior Design and Constructionv4 Reference Guide · Indoor Water Use Reduction, Step 1 and Rating System Variations, Retail

Maintained by VERTIQ, LEED software for consultants.