Credit Construction and Demolition Waste Management

Use a complete diversion route or the ID+C waste-generation limit, keeping one consistent measurement basis.1

Points
See below
Applies to
ID+CBD+C
Other versions
v4.1
VERTIQ reference ID
MRc6

Reviewed · Spot an error? Report it

Points

PointsRequirement
150% diversion and three streams
275% and four streams
2Waste-generation route

Do not add the alternative routes.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Waste tickets, unit basis, destinations, total/disposed/diverted report and stream classification.
  • Preparation checklist: For commingled averages, dated receipts and matching facility recovery-rate evidence; supporting standards evidence for any conditional WtE claim.
  • Preparation checklist: For project-specific commingled rates, weight of each load, sorted recyclable and residual weights, the measurement method, and supporting tickets, calculations, photographs and dates.

Worked example

Assume 100 tonnes of eligible C&D waste with 75 tonnes documented diverted across four qualifying streams, and no ADC counted as diversion. The ratio is 75/100 = 75%, corresponding to the 2-point diversion route. A commingled facility-average load alone cannot be relabeled four streams.12

Requirements

For diversion, recycle/salvage nonhazardous C&D waste and use consistent weight or volume throughout. Exclude excavated soil and land-clearing debris; alternative daily cover remains disposal. Divert at least 50% with three streams, or 75% with four. The October 2026 supplement also excludes landscaping materials from diversion calculations for projects registered on or after November 9, 2020.12

The alternative waste-generation route limits construction waste to 2.5 lb/square foot (12.2 kg/square meter). The October 2026 supplement applies to registrations on/after November 9, 2020. For commingled averages, retain receipt dates and matching facility rates and count the load as one stream. LEED v4 also allows project-specific commingled loads to claim each recyclable material as a separate stream when the recovery facility physically sorts the load and load, stream and residual weights are tracked and verified. It accepts measured volume-to-weight methods, not visual estimates; biomass/wood-derived fuel is distinct from WtE. Conditional v4 WtE requires exhausted reuse/recycling opportunities and the stated European standards; it is not automatically an international-only route.12

FAQ

Can measured cubic yards be combined directly with tonnes?

No. Use one consistent basis. A documented volume-to-weight conversion is permitted by the supplement, but a mixed-unit sum or visual estimate is not.12

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Construction and Demolition Waste Management; printed and PDF pp. 51
  2. USGBC Commingled (Mixed) Construction and Demolition Recycling Rate ReportingOctober 2026 · PDF pp.1-4; Table 1 facility averages, Table 3 measurement/diversion and definitions; PDF pp.1-4; Table 1 facility averages, Table 2 project-specific rates, Table 3 measurement/diversion and definitions