Credit Construction and Demolition Waste Management
Recover, reuse or recycle construction and demolition materials through a diversion path, or limit total construction waste per floor area.1
Reviewed · Spot an error? Report it
Points
1-2 points. Option 1 earns 1 point at 50% with three material streams or 2 points at 75% with four. Option 2 earns 2 points. The options are alternatives, so the maximum is 2.1
For third-party verified recycling rates, the October 2026 guidance points v4 projects to pilot credit MRpc87.2
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Construction and demolition waste calculator or equivalent tool tracking total waste, diverted waste and material streams
- Hauler weight tickets with explicit units and destinations
- Recycling-rate documentation for commingled facilities, with load dates matched to the facility average
- Measurement or volume-to-weight conversion records
- Physical-sorting and residual-weight records if claiming project-specific commingled material streams
- Total waste per floor area calculation for Option 2
- Waste-to-energy justification narrative and facility documentation against the EN standards, if used
Worked example
Assume 100 metric tonnes of eligible waste, with 20 tonnes landfilled and 80 tonnes recycled across four qualifying streams. Diversion = 80 / 100 x 100 = 80%, meeting the 2-point threshold if the processing evidence supports all four streams. Do not add soil or land-clearing debris to either total.1
Requirements
All BD+C adaptations, including Healthcare, use this credit. Recycle or salvage nonhazardous construction and demolition materials. Calculate by weight or volume and stay consistent throughout. Exclude excavated soil and land-clearing debris. Count materials destined for alternative daily cover (ADC) as waste, not diversion. Include wood converted to biofuel; other waste-to-energy is not diversion unless the project cannot meet the credit through reuse and recycling and follows the listed European directives and CEN EN 303 standards.1
Option 1 requires both diversion and material-stream thresholds: at least 50% and three streams for 1 point, or 75% and four streams for 2 points. Option 2 limits total construction waste to 2.5 lb/ft2 (12.2 kg/m2) of the building's floor area for 2 points.1
For projects registered on or after November 9, 2020, the October 2026 reporting guidance supplements the rating requirements. It prefers scale weights, accepts measured volume-to-weight conversion, and does not allow unmeasured visual estimates. Exclude hazardous waste, excavated soil, land-clearing debris and landscaping materials from the diversion calculation. ADC, including its landfill beneficial-use forms, stays in total generated waste and is not diversion.2
A commingled facility-average rate counts the load as one material stream. LEED v4 project-specific commingled reporting can count separately measured recovered materials as distinct streams only with the required load-weight, physical-sorting, residual and measurement-verification documentation. The applicable facility average must correspond to the delivery dates.2
Wood-derived biomass fuel is eligible diversion and is distinct from waste-to-energy. Table 3 of the guidance permits v4 waste-to-energy for U.S. and international projects, subject to exhausting reuse and recycling and to the directive and EN 303 conditions on p. 4. This does not make ordinary incineration diversion.2
FAQ
Is there a separate Healthcare version of this credit?
No. Healthcare uses this credit at 1-2 points, like the other BD+C adaptations.1
When can a commingled load support several material streams?
For v4, the October 2026 supplement permits project-specific reporting with the specified physical sorting, separate recovered and residual measurements, and verification. Using only the facility-average diversion rate counts the commingled load as one stream. The supplement applies to registrations from November 9, 2020 and does not replace rating requirements.2
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Construction and Demolition Waste Management, printed/PDF p. 105
- USGBC Commingled (Mixed) C&D Recycling Rate ReportingOctober 2026 supplemental guidance; registrations on or after November 9, 2020 · Applicability p. 1; facility and project-specific rates Tables 1-2, pp. 1-2; Table 3 p. 3; definitions p. 4
Maintained by VERTIQ, LEED software for consultants.