Credit Construction and Demolition Waste Management
Implement a fit-out waste plan, report the waste quantities, and meet the ID+C diversion or waste-prevention path. The credit has a two-point maximum.1
Reviewed · Spot an error? Report it
Points
| Points | Requirement |
|---|---|
| 1 | Option 1 |
| 2 | Option 2 |
Maximum: 2, even when both paths are demonstrated. Separate exemplary performance is subject to its own eligibility and review.12
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation checklist: Implemented waste plan and separate construction/demolition quantity register with floor-area basis.
- Preparation checklist: Tickets, hauler/facility records, corresponding facility-average periods, ADC/residual accounting and final waste report.
Worked example
Assume a 10,000 ft2 fit-out generates 60,000 lb of new-construction waste and 20,000 lb of demolition debris, of which 12,000 lb is salvaged/recycled. New-construction intensity = 60,000 / 10,000 = 6 lb/ft2, below 7.5. Demolition diversion = 12,000 / 20,000 x 100 = 60%, above 50%. With the required plan and prevention practices, these assumed figures meet the 2-point prevention path. No WtE or uncertain SI conversion is used.1
Requirements
Develop and implement a construction and demolition waste plan with waste-reduction strategies, targeted materials, destinations and expected diversion rates. Provide a final report covering disposal and diversion. Use weight or volume consistently under the Guide; exclude hazardous materials, excavated soil and land-clearing debris, and include alternative daily cover (ADC) as waste rather than diversion.12
Option 1 diverts at least 50% of total construction and demolition materials for 1 point. Option 2 requires at least 50% of demolition debris to be salvaged/recycled and less than 7.5 pounds/ft2 of new-construction waste, for 2 points. Track demolition and new-construction quantities separately. The source prints 37.5 kg/m2 alongside the IP threshold; these are not exact physical equivalents.1
For applicable projects registered on or after November 9, 2020, the October 2026 supplemental reporting guidance supports commingled facility-average rates matched to the delivery dates. Scaled weights are preferred; measured volume converted to weight is acceptable, while visual estimates are not. ADC remains in the denominator and not the diverted numerator. The supplement distinguishes qualifying wood-derived biomass fuel from waste-to-energy.12
For diversion calculations, exclude hazardous waste, excavated soil, land-clearing debris and landscaping materials from total waste generated, as identified in the October 2026 supplemental guidance for projects registered on or after November 9, 2020.2
The November 2025 ID+C Guide provides a conditional international route for nonwood waste-to-energy where reuse and recycling cannot meet diversion requirements. Include the strategy in the waste management plan, demonstrate that reuse and recycling options were exhausted, and document facility compliance with Directives 2008/98/EC and 2000/76/EC and applicable CEN EN 303 standards. This ID+C route is directly documented, but the October 2026 supplement still contains the conflicting v4-only definition; v4.1 WtE eligibility is not treated as resolved here.123
FAQ
Can 1 diversion point and 2 prevention points produce 3 points?
No. The ID+C credit maximum is 2.1
Can a mixed facility visually estimate the recycled share?
The October 2026 supplement rejects unmeasured visual estimates and calls for documented facility-average rates corresponding to the received loads.2
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 Interior Design and Construction GuideNovember 2025 · Construction and Demolition Waste Management, printed/PDF pp. 132-137; conditional international nonwood WtE route at pp. 134-136, including Option 1 Diversion, Further Explanation, International Tips and Required Documentation; ID+C scorecard printed/PDF pp. 5-6
- Commingled (Mixed) Construction and Demolition Recycling Rate ReportingOctober 2026; supplemental guidance for registrations on/after November 9, 2020 · Printed/PDF p. 1 applicability and supplemental status; p. 3 Table 3 exclusions from diversion calculations and version-specific WtE cells; p. 4 Diversion rate, biomass and WtE definitions
- LEED v4.1 Interior Design and Construction Addenda Table, first editionNovember 3, 2025 cumulative table · PDF pp. 93-94, MR Construction and Demolition Waste Management, Diversion / Further Explanation / International Tips conditional international WtE route and WtE documentation; source row begins PDF p. 88
Maintained by VERTIQ, LEED software for consultants.