Credit Quality Views
Provide clear outdoor views for 75% of regularly occupied area and satisfy the view-quality test.1
Reviewed · Spot an error? Report it
Points
1 point.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation checklist: Regularly occupied-area takeoff, sightline plans/sections and glazing information.
- Preparation checklist: Two-view-type mapping with furniture/obstruction and any atrium allocation calculations.
Worked example
Assume 1,000 square meters of regularly occupied area and 800 square meters meet both clear outdoor-sightline and two-view-type conditions. The qualifying fraction is 80%, above 75%. This example uses no atrium contribution.1
Requirements
Achieve a direct exterior sightline through vision glazing for 75% of regularly occupied floor area, without image/color-distorting obstructions. Also give 75% of all regularly occupied floor area at least two of the four listed view types: differing sightlines, specified outdoor features, views within three window-head heights, or view-factor 3 or more.1
Interior atrium views may supply up to 30% of the required area. Include permanent obstructions and movable furniture/partitions in the analysis. Museum exhibit and other collection spaces may be excluded from the views requirements.12
FAQ
Is a single view through clear glass sufficient everywhere?
Clear glazing and sightline area are necessary, but 75% of regularly occupied area also needs two listed view types.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Quality Views; printed and PDF pp. 73
- LEED v4 Reference Guide for Interior Design and Construction AddendaCumulative through February 20, 2026 · PDF p.49, July 29, 2022 Museums entry
Maintained by VERTIQ, LEED software for consultants.