Prerequisite Fundamental Commissioning and Verification

Commission systems within the tenant scope and coordinate their operation with the base building.1

Points
Required
Applies to
ID+CBD+C
Other versions
v4.1
VERTIQ reference ID
EAp1

Reviewed · Spot an error? Report it

Points

Required prerequisite, with no points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: OPR, BOD, commissioning scope/plan and CxA qualifications.
  • Preparation checklist: Test/checklist records, issue log, final report and current-facilities/O&M plan.

Worked example

Assume a 25,000-square-foot fit-out. Because 25,000 exceeds the 20,000-square-foot exception boundary, the small-project CxA exception does not apply. A qualifying CxA and all applicable process tasks are still needed.1

Requirements

Commission mechanical, electrical, plumbing and renewable systems within scope under ASHRAE Guideline 0-2005 and 1.1-2007. Include OPR/BOD, design review, commissioning plan, construction requirements, checklists, test procedures and verification, issue log, final report and direct owner reporting. Exterior-enclosure work here is limited to OPR/BOD and design review.1

Engage a qualified CxA by the end of design development, with two comparable projects extending through at least ten months of occupancy. Apply the independence rules; projects below 20,000 square feet have a design/construction-team exception. Maintain a current-facilities and O&M plan, including tenant systems furnished by the base building but modified or relocated for fit-out.1

FAQ

Can base-building equipment modified in the fit-out be ignored?

No. Commissioning covers equipment in project scope, including base-building items modified or relocated for the tenant work.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Fundamental Commissioning and Verification; printed and PDF pp. 22-23

Maintained by VERTIQ, LEED software for consultants.