Credit Advanced Energy Metering

Tenant-level metering earns 1 point; advanced metering earns 2.1

Points
See below
Applies to
ID+CBD+C
Other versions
v4.1
VERTIQ reference ID
EAc3

Reviewed · Spot an error? Report it

Points

Option 1: 1 point; Option 2: 2 points total.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Tenant energy-source/end-use inventory, meter schedule and interval/storage specifications.
  • Preparation checklist: Energy-data-sharing commitment and remote reporting evidence.
  • Preparation checklist: Controls drawings or single-line diagrams indicating all meters, plus manufacturer cutsheets for Option 2.

Worked example

Assume total tenant energy is 1,000 MWh/year and lighting is 120 MWh/year. Lighting is 120/1,000 = 12%, so it is above the advanced-metering end-use threshold. Metering lighting alone does not meet the all-sources requirement.1

Requirements

Option 1 meters all tenant energy sources, tracks at least monthly, and commits to sharing consumption and metered electrical-demand data with USGBC for five years from certification acceptance, or until ownership/lessee changes. Base-building service water heating, locally generated renewable energy dedicated to the project, and shared air-handling or DX components serving areas beyond the project do not need tenant-level meters. Components serving only the project space stay in scope, and excluded shared air-handling equipment is reported with the shared data.12

Option 2 meters all tenant energy sources and individual end uses at or above 10% of total annual consumption. Permanently installed meters must record at least hourly, transmit remotely, record electric consumption/demand, store at least 18 months, allow remote access and report hourly/daily/monthly/annual use. Prepare the energy-data-sharing commitment for either option. Under Option 2, shared air-handling or shared renewable systems may instead be documented by showing the building complies with the BD+C Advanced Energy Metering requirements. This applies to shared systems above 10% of building energy consumption, not to sources or end uses contained in the project space.12

FAQ

Is monthly utility data enough for advanced metering?

No. Option 2 requires hourly-or-shorter recording plus the stated transmission, retention and reporting capabilities.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Advanced Energy Metering; printed and PDF pp. 33
  2. LEED v4 Reference Guide for Interior Design and Construction AddendaCumulative through February 20, 2026 · PDF p.11, February 20, 2026 documentation correction applying sharing commitment to both options; PDF p.20 end-use clarification; PDF p.11, February 20, 2026 documentation correction; PDF p.19, Option 1 scope; PDF p.20, end-use clarification; PDF p.23, shared systems and documentation