Credit Advanced Energy Metering

Provide permanent energy monitoring with the required source/end-use coverage and usable retained data.1

Points
1 point
Applies to
BD+CID+C
Other versions
v4.1
VERTIQ reference ID
EAc3

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Annual energy end-use breakdown
  • Single-line diagrams and panel schedules showing all meters, plus communications diagram
  • List of all advanced meters with metered energy source or end use, meter/BMS details and reporting intervals
  • Data retention and remote-access specification

Worked example

Assume a modeled end use consumes 120 MWh of a 1,000 MWh annual building total. Its share = 120 / 1,000 x 100 = 12%, so it crosses the standard path's 10% individual-end-use threshold.1

Requirements

For the standard path, meter all whole-building energy sources and individual end uses representing at least 10% of annual building consumption. Record at intervals of one hour or less, transmit remotely and retain at least 36 months. Electricity meters capture consumption and demand; all meters support the stated reporting periods. Core and Shell requires advanced metering for all base-building energy sources, plus installed meters for future tenant spaces with at least one meter per energy source per floor.1

FAQ

Are monthly utility bills alone advanced metering?

No. The credit requires permanent interval recording, communications, retention and reporting capabilities.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.