Prerequisite Environmental Tobacco Smoke Control
Prevent smoke exposure through the required smoking policy, separation and signage.1
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- No-smoking policy and lease language where applicable
- Site plan with smoking-area distances
- Signage plan/photographs
- Residential compartmentalization and leakage test records if used
Worked example
Assume an outdoor smoking area lies 9 m from the entry but 5 m from an operable window. The minimum separation is 5 m, below 7.5 m, so the entry distance alone does not establish the standard path.1
Requirements
The standard path prohibits indoor smoking and limits outdoor smoking to designated areas at least 7.5 m from entries, outdoor-air intakes and operable windows, with the stated local-code exception. Post the required entry signage. Schools prohibit smoking across the site. Residential projects using the alternative need the specified common-area policy, compartmentalization and leakage verification.1
FAQ
Is a smoking area acceptable just because it is far from the main entrance?
Check every relevant entry, air intake and operable window, as well as applicable off-property business-use areas.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Environmental Tobacco Smoke Control prerequisite, printed/PDF pp. 110-111
Maintained by VERTIQ, LEED software for consultants.