Credit Daylight
Demonstrate daylight with one eligible simulation or measurement method and provide glare controls.1
Reviewed · Spot an error? Report it
Points
Generally 1-3 points depending on method; Healthcare up to 2. Standard annual simulation awards 2 points at 55% sDA and 3 at 75%, together with the ASE criterion.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Daylight model/report and weather file
- Regularly occupied/perimeter-area plan
- Glare-control specifications
- Timed field-measurement logs if using measurement
Worked example
Assume standard New Construction annual simulation shows sDA300/50% = 60% of regularly occupied floor area, and ASE1000,250 = 8% using the daylit area specified by the rating-system text. The results meet the 55% sDA and at-most-10% ASE band for 2 points if glare controls and the other simulation conditions are satisfied.1
Requirements
Provide manual glare-control devices, or automatic devices with manual override, for all regularly occupied spaces. Choose annual sDA/ASE simulation, equinox illuminance simulation, or field measurement. For annual simulation, determine sDA300/50% over regularly occupied floor area and satisfy the applicable sDA threshold. The July 2019 text requires ASE1000,250 no more than 10% using the regularly occupied floor area that is daylit in the sDA simulations. Healthcare uses its perimeter-area boundary and thresholds; Core and Shell uses the stated unfinished-space reflectance and occupancy assumptions.1
FAQ
Does a high sDA value remove the ASE check?
No. The annual-simulation path requires both daylight autonomy and sunlight-exposure compliance.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Daylight, printed/PDF pp. 131-133
Maintained by VERTIQ, LEED software for consultants.