Credit Indoor Air Quality Assessment

Demonstrate postconstruction IAQ through the complete flush-out or air-testing option.1

Points
See below
Applies to
BD+CID+C
Other versions
v4.1
VERTIQ reference ID
EQc4

Reviewed · Spot an error? Report it

Points

Flush-out earns 1 point; air testing earns 2. The options are alternatives.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Completion/cleaning and occupancy schedule
  • Flush-out airflow, time, temperature and humidity logs
  • Air-sampling plan and accredited-laboratory reports, with ISO/IEC 17025 accreditation documentation including the certificate and accredited scope that highlights the test methods used
  • Corrective-action and retest records where applicable

Worked example

Assume the preoccupancy flush-out path covers 10,000 ft2 gross area. Required outdoor-air volume = 10,000 x 14,000 = 140,000,000 ft3, while temperature/humidity and other conditions must also be maintained.1

Requirements

Perform the selected path after construction and cleaning, with finishes/furnishings installed and major VOC punch-list work complete. Flush-out has specific outdoor-air volume, temperature, humidity and occupancy conditions. Air testing uses listed contaminants, methods, locations and normal operating ventilation, with corrective action and retesting where limits are exceeded. Include ISO/IEC 17025 accreditation documentation, with the certificate and accredited scope that highlights the test methods used, in the air testing report. The options cannot be combined. Core and Shell is not listed as eligible in this edition.21

FAQ

Can part flush-out and part testing simply be added for two points?

No. The source states that the options cannot be combined.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Indoor Air Quality Assessment, printed/PDF pp. 124-126
  2. LEED v4 BD+C Reference Guide AddendaCumulative table, February 20, 2026 · Indoor Air Quality Assessment, Step by Step Guidance, Option 2, Step 3, addenda PDF p. 85 (Reference Guide p. 704), post date 2/20/2026

Maintained by VERTIQ, LEED software for consultants.