Credit Construction Indoor Air Quality Management Plan

Control pollutants and protect materials and systems during construction and before occupancy.1

Points
1 point
Applies to
BD+CID+C
Other versions
v4.1
VERTIQ reference ID
EQc3

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Construction IAQ management plan
  • Dated inspection logs and photographs
  • Material-storage and moisture-protection records
  • Filter installation/replacement logs
  • Healthcare infection-control plan if applicable

Worked example

Assume four air-handling units operated during construction but final replacement records cover only three. Coverage = 3 / 4 = 75%, leaving an unresolved unit; a written plan alone does not prove implementation.1

Requirements

Develop and implement the construction IAQ plan using the cited SMACNA measures. Protect absorptive materials stored on site and installed from moisture damage. If permanent air handlers operate during construction, use the specified filtration, then replace filtration before occupancy. Apply the construction smoking prohibition. Healthcare adds moisture-plan, VOC, outdoor-emission, noise/vibration and infection-control measures.1

FAQ

Does the plan replace site implementation records?

No. The credit requires the plan to be implemented through construction and preoccupancy activities.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Construction Indoor Air Quality Management Plan, printed/PDF pp. 122-123