Credit Construction Indoor Air Quality Management Plan
Implement construction and preoccupancy controls that protect materials and indoor air.1
Reviewed · Spot an error? Report it
Points
1 point.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Construction IAQ management plan
- Dated protection/filter/housekeeping photos and inspection logs
- Filter installation/replacement records
- Healthcare infection-control and other risk plans where applicable
Worked example
Assume permanent air handlers operate while drywall work continues. Document the required temporary return/transfer filters, protection against bypass and final filter replacement before occupancy. An invoice for the final filters does not by itself prove the construction-phase controls.1
Requirements
Use the applicable SMACNA measures, protect absorptive materials from moisture and control smoking. If permanent air handlers operate during construction, install the required return/transfer filtration without bypass, then replace with final design media before occupancy. Healthcare adds detailed moisture, particulates, VOC sequencing, outdoor emissions, noise/vibration and infection-control requirements.1
FAQ
Can a plan written after construction replace implementation records?
The requirement is to develop and implement the plan during construction and preoccupancy; retain records of the measures used.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 124-125
Maintained by VERTIQ, LEED software for consultants.