Credit Construction Indoor Air Quality Management Plan

Implement construction and preoccupancy controls that protect materials and indoor air.1

Points
1 point
Applies to
BD+CID+C
Other versions
v4
VERTIQ reference ID
EQc3

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Construction IAQ management plan
  • Dated protection/filter/housekeeping photos and inspection logs
  • Filter installation/replacement records
  • Healthcare infection-control and other risk plans where applicable

Worked example

Assume permanent air handlers operate while drywall work continues. Document the required temporary return/transfer filters, protection against bypass and final filter replacement before occupancy. An invoice for the final filters does not by itself prove the construction-phase controls.1

Requirements

Use the applicable SMACNA measures, protect absorptive materials from moisture and control smoking. If permanent air handlers operate during construction, install the required return/transfer filtration without bypass, then replace with final design media before occupancy. Healthcare adds detailed moisture, particulates, VOC sequencing, outdoor emissions, noise/vibration and infection-control requirements.1

FAQ

Can a plan written after construction replace implementation records?

The requirement is to develop and implement the plan during construction and preoccupancy; retain records of the measures used.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.