Credit Interior Lighting

Meet the selected lighting-quality strategies for glare, color, controls or surface reflectance.1

Points
Up to 2
Applies to
ID+CBD+C
Other versions
v4
VERTIQ reference ID
EQc6

Reviewed · Spot an error? Report it

Points

PointsRequirement
1One compliant strategy
2Three compliant strategies
2Maximum

1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Lighting fixture/photometric and color-rendering schedule, or glare modeling for the selected route.
  • Preparation checklist: Space/control coverage calculations and finish/furniture reflectance data for selected strategies.

Worked example

Assume the project documents compliant glare control and color rendering in every regularly occupied space, and dimmable/multilevel controls in 19 of 20 such spaces. Control coverage = 19 / 20 x 100 = 95%. With all three strategies fully compliant, the project supports 2 points; it need not claim the separate reflectivity strategy.1

Requirements

Glare control in all regularly occupied spaces uses fixtures below 7,000 cd/m2 between 45 and 90 degrees from nadir, or modeled UGR below 19, subject to the stated fixture exceptions.1

Color rendering uses CRI at least 90, or TM-30 fidelity at least 78 with gamut index 97-110. Lighting control provides dimmable or multilevel lighting in at least 90% of regularly occupied spaces.1

Surface reflectivity applies to at least 90% of regularly occupied spaces, with ceilings at least 80% and walls at least 55%; in-scope furniture work surfaces are at least 45% and movable partitions at least 50%. Apply the whole strategy scope before counting it.1

FAQ

Does UGR equal to 19 meet the modeled glare route?

No. The requirement is below 19.1

Do two completed strategies earn two points?

No. One strategy earns one point; three are needed for two.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 Interior Design and Construction GuideNovember 2025 · Interior Lighting, printed/PDF pp. 169-171; ID+C scorecard printed/PDF pp. 5-6

Maintained by VERTIQ, LEED software for consultants.