Credit Interior Lighting
Meet the selected lighting-quality strategies for glare, color, controls or surface reflectance.1
Reviewed · Spot an error? Report it
Points
| Points | Requirement |
|---|---|
| 1 | One compliant strategy |
| 2 | Three compliant strategies |
| 2 | Maximum |
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation checklist: Lighting fixture/photometric and color-rendering schedule, or glare modeling for the selected route.
- Preparation checklist: Space/control coverage calculations and finish/furniture reflectance data for selected strategies.
Worked example
Assume the project documents compliant glare control and color rendering in every regularly occupied space, and dimmable/multilevel controls in 19 of 20 such spaces. Control coverage = 19 / 20 x 100 = 95%. With all three strategies fully compliant, the project supports 2 points; it need not claim the separate reflectivity strategy.1
Requirements
Glare control in all regularly occupied spaces uses fixtures below 7,000 cd/m2 between 45 and 90 degrees from nadir, or modeled UGR below 19, subject to the stated fixture exceptions.1
Color rendering uses CRI at least 90, or TM-30 fidelity at least 78 with gamut index 97-110. Lighting control provides dimmable or multilevel lighting in at least 90% of regularly occupied spaces.1
Surface reflectivity applies to at least 90% of regularly occupied spaces, with ceilings at least 80% and walls at least 55%; in-scope furniture work surfaces are at least 45% and movable partitions at least 50%. Apply the whole strategy scope before counting it.1
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 Interior Design and Construction GuideNovember 2025 · Interior Lighting, printed/PDF pp. 169-171; ID+C scorecard printed/PDF pp. 5-6
Maintained by VERTIQ, LEED software for consultants.