Credit Interior Lighting
Use the required number of lighting-quality/control strategies, or the Healthcare control route.1
Reviewed · Spot an error? Report it
Points
General listed adaptations: 1-2 points. Healthcare: 1 point.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Lighting fixture and driver/control schedule
- Photometric/glare and color-rendering reports
- Regularly occupied space control-coverage plan
- Surface reflectance or Healthcare patient-control schedule
Worked example
Assume an eligible general-route project fully meets glare control, color rendering and lighting controls. Those three complete strategies support 2 points. For example, lighting control in only 80% of regularly occupied spaces does not satisfy that strategy's 90% coverage.1
Requirements
For the listed general adaptations, meet one strategy for 1 point or three for 2: glare, color rendering, lighting controls and surface reflectivity. Each strategy has its own whole-space or percentage coverage rule. Healthcare instead requires dimmable/multilevel lighting in 90% of regularly occupied staff areas and bed-accessible controls in 75% of applicable patient sleeping rooms, with specified exceptions. Do not assume the general strategy route applies to every BD+C adaptation.1
FAQ
Are all four strategies required for two points?
The general route requires three compliant strategies for two points.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 131-132
- LEED v4.1 BD+C GuideNovember 2025 · EQ Credit: Interior Lighting, PDF p. 261, applicability list (Retail 1-2 points) and requirements heading
Maintained by VERTIQ, LEED software for consultants.