Credit Indoor Air Quality Assessment

After finishes are installed and the project is cleaned, choose the flush-out option or the air-testing option. Their points cannot be combined.1

Points
See below
Applies to
ID+CBD+C
Other versions
v4
VERTIQ reference ID
EQc4

Reviewed · Spot an error? Report it

Points

Option 1 flush-out: 1 point. Option 2: 1 point per compliant testing path, maximum 2. Flush-out and testing cannot combine.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Completion/cleaning/filter records and the selected assessment plan.
  • Preparation checklist: Measured outdoor-air volume and environmental logs for the flush-out report, or the IAQ testing report with accredited laboratory results, ISO/IEC 17025 certificate and accredited scope highlighting the test methods used, sample locations, methods, limits and corrective-action/retest records.

Worked example

Assume a 10,000 ft2 project uses the complete preoccupancy flush-out path with constant measured outdoor airflow of 10,000 cfm. Required volume = 10,000 x 14,000 = 140,000,000 ft3. Time = 140,000,000 / 10,000 = 14,000 minutes, or 233.33 hours. This assumes the required temperature/humidity, completion, cleaning and filter conditions throughout; it does not convert a total supply-air reading into outdoor airflow.1

Requirements

Complete construction, all interior finishes and movable furnishings, major VOC punch-list work and final cleaning before the assessment. Option 1 flush-out supplies 14,000 ft3 of outdoor air per ft2 of gross floor area, with new filters, temperature between 60 and 80 F and relative humidity no greater than 60%.1

The early-occupancy flush-out path permits occupancy after at least 3,500 ft3/ft2. Continue at the greater of 0.30 cfm/ft2 or the prerequisite design minimum, beginning at least three hours before occupancy each day and continuing during occupancy, until the total 14,000 ft3/ft2 is delivered. Maintain the stated environmental conditions.1

Option 2 tests under normal occupied ventilation conditions after construction and before occupancy; Retail may test within 14 days of occupancy. Path 1 particulate/inorganic-gas testing earns 1 point, Path 2 VOC testing earns 1, or both earn 2. Meet all applicable Table 1/2 limits and methods. The PM2.5 limit is 12 micrograms/m3, or 35 only in qualifying high-ambient/nonattainment areas. VOC testing includes the full individual-compound list and TVOC screening; TVOC above 500 micrograms/m3 triggers investigation/correction as required, rather than an automatic TVOC failure.1

FAQ

Can flush-out and one testing path add to two points?

No. The two options cannot be combined.1

Is 500 micrograms/m3 TVOC a simple pass/fail limit?

The Guide uses it as a screening trigger for investigating individual VOCs and correcting identified issues, not as an automatic credit failure.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 Interior Design and Construction GuideNovember 2025 · Indoor Air Quality Assessment, printed/PDF pp. 162-165; ID+C scorecard printed/PDF pp. 5-6

Maintained by VERTIQ, LEED software for consultants.