Credit Sensitive Land Protection

Use previously developed land or keep the development footprint away from defined sensitive land.1

Points
See below
Applies to
BD+C
Other versions
v4v5
VERTIQ reference ID
LTc2

Reviewed · Spot an error? Report it

Points

1 point for New Construction, Schools, Retail, Data Centers, Warehouses and Distribution Centers, Hospitality and Healthcare; 2 points for Core and Shell.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Site development-history records
  • Survey showing footprint and water/wetland boundaries
  • Flood, soil and protected-species assessments

Worked example

Assume an undeveloped site's footprint is 40 m from a water body and 20 m from a wetland. Those distances exceed the stated 30 m and 15 m buffers, but farmland, flood and habitat screening must also pass before Option 2 is established.1

Requirements

Option 1 places the footprint on previously developed land. Option 2 avoids the listed farmland, flood hazard, habitat, water-body and wetland conditions. The water-body buffer is 100 feet (30 m) and the wetland buffer is 50 feet (15 m), with the stated minor-improvement exceptions. Use local-equivalent classifications outside the United States where allowed.1

FAQ

Does an undeveloped site automatically fail?

No. It can use the sensitive-land avoidance option if every applicable condition is satisfied.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.