Credit Integrative Process

Use early analyses in two issue areas to change design decisions and document the team's process.1

Points
1 point
Applies to
BD+CID+C
Other versions
v4
VERTIQ reference ID
IPc1

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Early energy/water or other selected issue-area analyses
  • OPR and BOD decision records
  • Signed integrative-process facilitator letter
  • Stakeholder distribution record

Worked example

Assume the team completes an energy simple-box analysis and a preliminary water budget before schematic design closes. Two analyzed areas meet the selection count, but the signed letter must still explain how findings changed design and how stakeholders received it.1

Requirements

Select two areas from energy, water, resilience, social equity, and health and well-being. Meet each selected area's discovery requirements and use findings in the OPR, BOD and design documents. Energy and water discovery occurs before schematic design is complete. Provide a dated facilitator's letter, signed by principal team members, explaining the analyses, resulting design decisions and stakeholder distribution.1

FAQ

Must every project analyze all five areas?

No. The credit requires two selected issue areas, with the applicable requirements for each.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 9-11

Maintained by VERTIQ, LEED software for consultants.