Prerequisite Minimum Indoor Air Quality Performance

Meet the appropriate ventilation standard and monitor the required outdoor-air delivery.1

Points
Required
Applies to
BD+CID+C
Other versions
v4
VERTIQ reference ID
EQp1

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Ventilation calculations and equipment schedules, plus filter data confirming MERV 11 or higher where the site is treated as PM2.5 nonattainment
  • Outdoor-air monitoring/alarm specifications
  • Natural ventilation analysis where selected
  • Residential/Healthcare compliance schedules where applicable

Worked example

Assume a mechanical system's minimum outdoor-air setpoint is 2,000 cfm. A 15% deviation is 300 cfm, so the alarm logic must detect the specified deviation from the setpoint. Monitor accuracy and the underlying ventilation calculation remain separate tests.1

Requirements

General mechanically ventilated spaces use ASHRAE 62.1-2016 listed sections or a more stringent local equivalent. Applicable systems above 1,000 cfm outdoor intake require monitoring with stated accuracy and alarms; eligible constant-volume systems have an indicator alternative. Natural ventilation follows one of three defined paths using addendum l, plus the applicable monitoring. The IAQ Procedure in Section 6.3 cannot establish compliance. Residential units add ventilation, exhaust, combustion and CO safeguards; Healthcare uses ASHRAE 170-2017 Sections 6-10 and mechanical monitoring.1

FAQ

Can CO2 monitoring replace every mechanical outdoor-air flow requirement?

Use the monitoring method permitted for the actual ventilation path; natural-ventilation CO2 provisions are not a general waiver for mechanical airflow monitoring.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 111-113

Maintained by VERTIQ, LEED software for consultants.