Credit Thermal Comfort
Meet comfort design criteria and provide the required occupant controls.1
Reviewed · Spot an error? Report it
Points
1 point; follow the listed adaptation applicability, which does not include Core and Shell.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Thermal comfort design assessment showing ASHRAE 55-2017 80% acceptability and direct solar radiation compliance
- Space/occupancy and control coverage schedule
- Thermostat, air-speed or other local-control plans
Worked example
Assume there are 60 eligible individual occupant spaces and 10 shared multioccupant spaces. At least 30 individual spaces need controls and all 10 shared spaces need group controls. Passing the count does not establish thermal comfort design compliance.1
Requirements
Use ASHRAE 55-2017 with errata or a local equivalent, with the natatorium and adaptation-specific design rules. General controls serve at least 50% of individual occupant spaces and all shared multioccupant spaces. Healthcare also needs controls in every patient room. Hospitality guest rooms are excluded from the calculation; Retail and Warehouses have specified space scopes.1
FAQ
Can one central thermostat count for all individual offices?
The credit requires individual controls for the stated share of individual occupant spaces, plus group controls for shared spaces.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 129-130
Maintained by VERTIQ, LEED software for consultants.