WEp1 Water Metering and Reporting

Measure and report the whole project's potable and alternative water use, including associated grounds.1

Points
Required
Applies to
O+MBD+C

Reviewed · Spot an error? Report it

Points

Required prerequisite with no credit points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Whole-project water meter inventory and boundary diagram
  • 12-month water-use report by source
  • Annual USGBC data-sharing commitment

Worked example

Assume the project uses 900,000 gallons of municipal potable water and 100,000 gallons of separately metered reclaimed water over 12 months. Report each source separately and reconcile 1,000,000 gallons in total; the total alone does not replace the source records or sharing commitment.1

Requirements

Use permanent meters that cover each supplied water source. Meter alternative sources separately from municipal potable water, make data accessible to the facility manager or tenant, and report the full 12-month period. Commit to annual sharing of whole-project water-use data with USGBC after certification.1

FAQ

Does one combined reading cover both water sources?

Alternative sources must be metered separately from municipal potable water. Keep the source-level records even when presenting a whole-project total.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 O+M Rating SystemJuly 2026 · WEp1, printed pp. 26-26 (PDF pp. 32-32); scorecard pp. 1-2

Maintained by VERTIQ, LEED software for consultants.