WEp1 Water Metering and Reporting
Meter whole-project potable and alternative water use and commit to annual reporting to USGBC.1
- Points
- Required
- Applies to
- BD+CO+M
Reviewed · Spot an error? Report it
Points
Required for NC and Core and Shell; no points. Enhanced submetering and leak detection are addressed separately in WEc1.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Whole-project water-meter schedule and plumbing diagram
- Potable and alternative source meter specifications
- Facility/tenant data-access arrangement
- Owner reporting commitment and source-specific reporting template
Worked example
Assume monthly readings show 900 m³ municipal potable water and 100 m³ separately metered alternative water. Total use = 900 + 100 = 1,000 m³, while the report preserves the two source totals rather than merging them into an untraceable single reading. This is a reporting example, not a water-efficiency reduction.1
Requirements
Install or use existing permanent meters covering building and associated-ground water consumption. Make meter data accessible to facility management and/or tenants. Meter alternative sources separately from municipal potable water. Commit to sharing whole-project source-specific water-use data at least annually for five years or until ownership/lessee changes. Future tenant utility services and submeters installed in tenant scope can be excluded from the project-scope requirement.1
FAQ
Can alternative water share the municipal potable meter?
The prerequisite requires alternative water sources to be metered separately from municipally supplied potable water.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 BD+C Rating SystemJuly 2026 · WEp1, printed pp. 54
Maintained by VERTIQ, LEED software for consultants.