IPp2 Human Impact Assessment
Document the social context of the building, its users, workforce, and surrounding community.1
- Points
- Required
Reviewed · Spot an error? Report it
Points
Required prerequisite with no credit points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Site survey and human impact assessment
- Community, occupant, and workforce context records
- Management-control and operational-response narrative
Worked example
Assume the assessment identifies poor access to essential services for cleaning staff and an underused common area. Record evidence, management control, and the operational response, while completing the other applicable categories. Two findings alone are not a universal compliance threshold.1
Requirements
Complete a site survey and human impact assessment using applicable demographics, local infrastructure/land use, human use/health, occupant experience, working conditions, and other relevant categories. At minimum, address parameters under project and site-management control. Where possible, explain how the findings informed operations. An assessment may serve same-location multitenant complexes or campus projects.1
FAQ
Can the assessment ignore issues outside direct management control?
The minimum expressly covers parameters within project and site-management control. The assessment still draws on the applicable contextual categories.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 O+M Rating SystemJuly 2026 · IPp2, printed pp. 8-9 (PDF pp. 14-15); scorecard pp. 1-2
Maintained by VERTIQ, LEED software for consultants.