IPp2 Human Impact Assessment

Assess community, workforce and occupant context to inform project-specific social and health decisions.1

Points
Required
Applies to
ID+CBD+CO+M

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points. It is a contextual assessment, not a minimum numerical equity score.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Relevant community/workforce/occupant information with sources
  • Preparation: Applicable accessibility-code assessment
  • Preparation: Project-specific design and operations strategies considered

Worked example

Assume a team records relevant findings in all four named categories and adds a fifth, project-specific topic. That covers the four-category framework plus one additional topic; category counts alone do not prove the quality or relevance of the assessment.1

Requirements

Draw on relevant information in demographics, infrastructure/land use, human-use/health impacts and occupant experience, as applicable. The listed examples include vulnerable populations, accessibility codes, social-service access, workforce/supply-chain protections and the surrounding sensory environment. Other relevant factors may be specified.1

Where possible, use the assessment to inform planning, design, operations and maintenance and describe project-specific strategies considered. The examples in each category do not mean every listed demographic variable is mandatory for every project.1

FAQ

Must the assessment use only the listed example variables?

No. The list is illustrative within the applicable categories and includes an Other entry.1

Does completing a demographic table alone satisfy the prerequisite?

The assessment also addresses the other relevant categories and how project-specific strategies were considered.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · IPp2; printed pp. 7-7, PDF pp. 12-12; scorecard printed pp. 1-2, PDF pp. 6-7