IPp1 Climate Resilience Assessment
Assess site-specific climate and natural hazards and identify at least two priorities for operations.1
- Points
- Required
Reviewed · Spot an error? Report it
Points
Required prerequisite with no credit points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Site-specific climate and natural-hazard assessment
- Scenario, service-life, and priority-hazard risk matrix
- Narrative connecting findings to O+M strategies
Worked example
Assume the assessment identifies flooding and extreme heat as the two priority hazards. A matrix that records only the hazard names is incomplete; add the required scenario, timeframe, risk components, and impacts for each. This is a completeness example, not a numerical risk model.1
Requirements
Document observed, projected, and future hazards that can affect the site and building function. Select at least two priorities. For each, identify the IPCC scenario and shared socioeconomic pathway, service life, hazard level and risk rating, exposure, sensitivity, adaptive capacity, vulnerability, overall risk, and potential site/function impacts. Where possible, describe how the assessment informed project-specific O+M strategies.1
FAQ
Is identifying one major hazard enough?
The source requires at least two priority hazards, with the specified assessment information for each.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 O+M Rating SystemJuly 2026 · IPp1, printed pp. 6-7 (PDF pp. 12-13); scorecard pp. 1-2
Maintained by VERTIQ, LEED software for consultants.