WEc2 Enhanced Water Efficiency

Reduce project water consumption beyond the prerequisite through whole-project modeling or the credit's specific fixture, equipment and process-water routes.1

Points
See below
Applies to
ID+CBD+C

Reviewed · Spot an error? Report it

Points

Maximum 8 points. Option 1 is 1-8; Option 2 is 1-6; Options 3 and 4 are each 1-2.1

Exemplary performance: reaching 65% alternative water under Option 1 earns 1 exemplary performance point, claimed under Project Priorities (EP10).2

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Baseline and proposed water calculation for the selected option
  • Preparation: Complete applicable equipment schedule and certifications
  • Preparation: Water-quality, process-demand or alternative-water evidence if using those routes

Worked example

Assume a complete Option 2 baseline of 100,000 gal/year and proposed fixture use of 60,000 gal/year. Reduction = 40%, which reaches 4 points in Table 2 if all applicable fixture and prerequisite conditions are met. No appliance, process or alternative-water points are added in this example.1

Requirements

Option 1 models a whole-project baseline and proposed water use, with points at increasing reductions from 30% to 65%. The alternative-water column has distinct totals. It is an alternative to the separate fixture/equipment approach.1

Option 2 uses the WEp1 fixture baseline and awards 1-6 points at reductions of 25%, 30%, 35%, 40%, 45% and 50%. Option 3 awards 1 point per fully compliant applicable appliance/process table, up to 2; equipment scope and minimum kitchen/laundry activity thresholds apply.1

The published achievement table also lists Option 4 process optimization, with cooling-tower concentration/cycles analysis, cooling-water efficiency or qualifying alternative process water. Its paths are alternatives. The introductory sentence names only Options 2 and 3, but Option 4 covers process water that they do not, so it combines with them under the 8-point maximum, as the table shows.1

FAQ

Does a 40% fixture reduction earn the whole-project table's points?

No. Apply the table for the selected option. Option 2 Table 2 gives 4 points at 40%.1

Can every option be freely added?

No. Option 1 is an alternative route. Options 2, 3 and 4 may be combined up to the 8-point maximum.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · WEc2; printed pp. 26-30, PDF pp. 31-35; scorecard printed pp. 1-2, PDF pp. 6-7
  2. USGBC LEED credit library: Enhanced Water Efficiency: Exemplary Performance (EP10)Published Apr 22, 2025; retrieved November 8, 2026 · EP10 requirements

Maintained by VERTIQ, LEED software for consultants.