WEc2 Enhanced Water Efficiency

Reduce water use beyond WEp2 using either a whole-project water model or an eligible combination of fixture, appliance, outdoor, process, and reuse strategies. Keep NC and Core and Shell thresholds separate.1

Points
See below
Applies to
BD+CID+C

Reviewed · Spot an error? Report it

Points

Maximum 8 points for NC and 7 for Core and Shell. Option 1 starts at 30% reduction for 1 point and rises by one point for each additional 5 percentage points, to 65% for NC or 60% for Core and Shell; the separate alternative-water column must be applied where applicable. Option 2 yields 1/2/3 points at 30%/35%/40%. Component points remain subject to the overall cap.1

Exemplary performance: reaching 65% under Option 1 (alternative water), a 45% reduction under Option 2, or a 60% reduction across Option 1 and Option 6, Path 2 (alternative water sources) earns 1 exemplary performance point, claimed under Project Priorities (EP10).2

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Fixture schedule and manufacturer flow/flush-rate data
  • Baseline and proposed water-use calculation workbook
  • Landscape and irrigation demand model for the outdoor path
  • Equipment schedule and specifications for appliance or process paths
  • Makeup-water analysis and cooling-system calculation for the cooling-tower path
  • Alternative-water balance and reuse system drawings, if applicable
  • Documentation confirming that no permanent irrigation system is installed, for the no-irrigation path

Worked example

Assume Option 2 only, a baseline of 1,000,000 liters/year, and proposed fixture use of 650,000 liters/year, with all baseline and occupancy inputs consistent. Reduction = (1 - 650,000/1,000,000) × 100 = 35%. That reaches 2 points under Table 2 for NC or Table 12 for Core and Shell. This calculation does not establish appliance, outdoor, or reuse achievement.1

Requirements

Option 1 is an alternative to combining Options 2-6. It requires baseline and proposed whole-project water models. Option 2 uses the fixture-and-fittings calculated baseline from WEp2 and awards points at 30%, 35%, and 40% reduction.1

Other options address compliant appliance/process equipment, irrigation demand, cooling or other process water, and reuse-ready or alternative-water systems. Check the applicability conditions and the tables for the relevant building scope. No permanent irrigation after a maximum two-year establishment period earns 2 points for NC or 3 for Core and Shell.1

FAQ

Can Option 1 be added to the fixture-only option?

No. Choose Option 1 or a combination of Options 2-6.1

Do NC and Core and Shell use the same irrigation points?

No. The no-irrigation path earns 2 points for NC and 3 for Core and Shell; use the applicable requirements section.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 BD+C Rating SystemJuly 2026 · WEc2, printed pp. 62-74
  2. USGBC LEED credit library: Enhanced Water Efficiency: Exemplary Performance (EP10)Published Apr 22, 2025; retrieved November 8, 2026 · EP10 requirements

Maintained by VERTIQ, LEED software for consultants.