MRp2 Quantify and Assess Embodied Carbon

Quantify A1-A3 embodied carbon for the in-scope interior materials and identify the three largest sources with reduction strategies considered.1

Points
Required
Applies to
ID+CBD+C

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points. It requires quantification and assessment, not a minimum percentage reduction.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Material quantities matched to declared-unit A1-A3 factors
  • Preparation: Calculation workbook or tool A1-A3 report
  • Preparation: Top-three-source assessment and strategies considered
  • Preparation: Description of embodied-carbon data sources and baseline justification where recommended values are not available

Worked example

Assume three in-scope material entries: flooring 1,000 m2 at 8 kg CO2e/m2, wallboard 2,000 m2 at 2 kg CO2e/m2, and ceiling material 500 m2 at 3 kg CO2e/m2. Their A1-A3 impacts are 8,000, 4,000 and 1,500 kg CO2e, totaling 13,500 kg CO2e. They are the top three sources in this deliberately limited example; a real project must include its complete applicable scope and discuss reduction strategies.1

Requirements

Quantify material quantities and GWP for in-scope gypsum wallboard, flooring, insulation, wood and wood composites, wall framing, ceiling systems, concrete, metals, and paints and coatings. Furniture may be included at the project team's discretion.1

Calculate cradle-to-gate A1-A3 emissions as GWP per unit multiplied by installed material quantity, or report A1-A3 results from an LCA or embodied-carbon tool. Identify the top three embodied-carbon sources and describe the project-specific strategies considered for those sources.1

FAQ

Are product-specific Type III EPDs explicitly required here?

The prerequisite text requires quantities and GWP calculations or tool A1-A3 results. It does not state the product-specific/facility-specific Type III EPD condition used in MRc2 Option 1.1

Must furniture be included?

Furniture is optional for this prerequisite. Keep that scope decision explicit.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · MRp2; printed p. 70, PDF p. 75; scorecard printed pp. 1-2, PDF pp. 6-7; MRc2 Option 1 product and facility-specific Type III EPD contrast, printed p. 74 / PDF p. 79

Maintained by VERTIQ, LEED software for consultants.